My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
2300 - Underground Storage Tank Program
>
PR0231532
>
INSTALL_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2021 10:24:33 AM
Creation date
11/8/2018 10:24:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0231532
PE
2351
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
01
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS3\C\CAMBRIDGE\16470\PR0231532\INSTALL 2018.PDF
QuestysFileName
INSTALL 2018
QuestysRecordDate
7/2/2018 8:57:03 PM
QuestysRecordID
3932889
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' P_re-ssure S_ensor Installation Under Dispenser fnsta6atgo Steps <br /> 15. Get the contents of the pressure sensor drying tube kit (Table 2). Thread a tie wrap (item 3)through the slots <br /> in each of the self-adhesive mounts (item 4). Place the top mount against the large cap on one end of the <br /> tube and tighten the tie wrap until it is against the tube cap but you can still rotate the tube. Place the second <br /> mount against the other end cap of the tube, again pulling the tie wrap through the mount until it is against <br /> the tube cap but you can still rotate the tube. <br /> Remove the two soft plastic seals from each end port of the drying tube. Get the Tygon tubing (item 2) from <br /> the kit and attach one end of the tubing to one end of the drying tube. Slide the tubing onto the drying tube <br /> as far as you can (snug). Referring to Figure 1, position the drying tube vertically against the inside of the <br /> 1 dispenser with the open port of the tube down and above grade and estimate the length needed to loop from <br /> the top of the drying tube and over to the vent port (off center) of the Vapor Pressure Sensor. Cut the Tygon <br /> tubing at the estimated length. <br /> Remove the paper cover from the self-adhesive base of the two tie wrap mounts and stick the drying tube to <br /> the inside of the dispenser in the spot you selected earlier. Pull each of the tie wraps snug and cut off the <br /> excess. Attach the other end of the Tygon tubing to the vent port (off center) of the Vapor Pressure Sensor. <br /> ' NOTE: the down port of the drying tube must remain open and be oriented down as shown in Figure 1. <br /> 16. After the Vapor Pressure Sensor is installed, pressurize the tank ullage space and vapor piping to at least 2 <br /> inches WC and test for leaks using leak detection solution. <br /> ' 17. Replace lower dispenser sheet metal doors onto dispensers. <br /> Ei <br /> JAN I <br /> ' ENVI^ONIr`719 i *.L H'ALTH <br /> L�, <br />
The URL can be used to link to this page
Your browser does not support the video tag.