Laserfiche WebLink
IPressure Sensor InstallaVon Vapor trent Stack Installation Step <br /> facing down. Locate the pressure sensor in the clamp, but leave the conduit clamp screw somewhat loose for <br /> ' later sensor height adjustment. <br /> 5. Install two169CA-4-4 male elbows (item 7 in Table 3) into each end of the 3-way calibration valve (item 5 in <br /> Table 3) as shown (see Figure 7). <br /> 6. Install one 68CA-4-4 male connector (item 1 in Table 3) into the center port of the 3-way calibration valve, <br /> and then directly attach it to the vapor pressure sensor inlet port (center) (see Figure 7). <br /> 7. Screw the 59CA-4 plug (item 2 in Table 3) onto the left port's male elbow (see Figure 7). <br /> ' 8. Install the two plastic enclosure mounting plates to the back of the enclosure. Use the four short flat-head <br /> screws included in the enclosure hardware bag. <br /> 9. Install the composite panel into the enclosure (item 5 in Table 4) such that the sensor cable outlet is facing up <br /> ' and the pressure sensing port tube in the base of the sensor is facing down.The top symbol on the panel <br /> should be facing upward. Use the four short screws included in the enclosure hardware bag. <br /> 10. Make sure that the white flanged porous vent (factory installed - item 2 in Table 4) is still securely installed <br /> ' into the hole in the bottom of the enclosure (see Figure 7). <br /> 11. Insert the S-bend 1/4" OD copper tube (item 10 in Table 3) into the right-side male elbow of the 3-way <br /> calibration valve, but do not fully tighten the compression nut (see Figure 7). <br /> t 12. Locate the 62CABH-4 bulkhead union (item 8 in Table 3) and remove the compression nut and the <br /> adjustable nut then place a large washer (item 9 in Table 3) against the fixed, integral body nut. Slide the <br /> compression nut that was removed onto the bottom portion of the S-bend tube. <br /> 13. Partially insert the bulkhead union into the bottom center hole in the enclosure. Slide a large washer over the <br /> body, and thread the adjustable nut back onto the body. <br /> ' 14. Insert the bottom portion of the S-bend tube into the bulkhead union and fully tighten the bulkhead union <br /> adjustable nut against the large washer and enclosure wall. Adjust the pressure sensor vertically in the shim/ <br /> conduit clamp to make sure the S-bend tube is fully inserted into the union and male elbow. <br /> 15. Fully tighten the compression nuts to connect the S-bend tube to the union and to the male elbow. Tighten <br /> ' the sensor conduit clamp screw to secure the sensor in its final vertical position (see Figure 7). <br /> 16. Get the contents of the pressure sensor drying tube kit (Table 2).Thread a tie wrap (item 3)through the slots <br /> in each of the self-adhesive mounts (item 4). Place the top mount against the large cap on one end of the <br /> t tube and tighten the tie wrap until it is against the tube cap but you can still rotate the tube. Place the second <br /> mount against the other end cap of the tube, again pulling the tie wrap through the mount until it is against <br /> the tube cap but you can still rotate the tube. <br /> ' Remove the two soft plastic seals from each end port of the drying tube. Get the Tygon tubing (item 2) from <br /> the kit and attach one end of the tubing to one end of the drying tube. Slide the tubing onto the drying tube <br /> as far as you can (snug). Referring to Figure 7, position the drying tube vertically in the enclosure with the <br /> ' open port of the tube up, and estimate the length needed to loop from the bottom of the drying tube up to the <br /> vent port (off center) of the Vapor Pressure Sensor. Cut the Tygon tubing at the estimated length <br /> (approximately a foot or so). Remove the paper cover from the self-adhesive base of the two tie wrap mounts <br /> and stick the drying tube to the inside of the enclosure as shown in Figure 7. Pull each of the tie wraps snug <br /> ' and cut off the excess. Attach the other end of the Tygon tubing to the vent port (off center) of the Vapor <br /> Pressure Sensor. NOTE: the upper port of the drying tube must remain open and be oriented up as shown in <br /> Figure 7. <br /> 17. Mount the plastic enclosure onto the vapor vent stack or suitable rigid structure ABOVE the vapor vent stack <br /> port using two conduit clamps (for 2" or 3" pipe), bolts, nuts, and washers included, or use other customer <br /> supplied suitable mounting hardware (Example: Unistrut®). Leave the mounting hardware somewhat looso Earn <br /> ' later enclosure height adjustment (see Figure 6). "'" F�N `— J <br /> 18. Measure, fabricate, and install customer supplied pipe and pipe fittings between''ahe.uapor'vent stack port n J <br /> and within a few inches of the bulkhead union in the bottom of the enclosure. <br /> JA'N iE. <br /> 13 ._i v7 <br />