My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
2300 - Underground Storage Tank Program
>
PR0231532
>
INSTALL_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2021 10:24:33 AM
Creation date
11/8/2018 10:24:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0231532
PE
2351
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
01
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS3\C\CAMBRIDGE\16470\PR0231532\INSTALL 2018.PDF
QuestysFileName
INSTALL 2018
QuestysRecordDate
7/2/2018 8:57:03 PM
QuestysRecordID
3932889
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Pressure Sensor Installation Vapor Vent Stack/nstaddadon Step <br /> 19. Install one 68CA-4-4 male connector (item 1 in Table 3) onto the top of the new pipe (see View A-A, <br /> Figure 6). <br /> 20. Measure,fabricate, and install 1/4" OD copper tubing (item 6 in Table 3) between the bulkhead union and the <br /> male connector. Adjust the enclosure vertically on vent pipe to make sure the copper tube is fully inserted into <br /> ' the bulk head union and male connector. <br /> 21. Fully tighten the compression nuts to secure the fabricated tube to the bulkhead union and to the male <br /> connector.Tighten the enclosure mounting hardware to secure the enclosure in its final vertical position. <br /> Note: Important!All plumbing's pitch to drain should be 1/4"vertical per 12" horizontal to eliminate any <br /> potential liquid traps. <br /> 22. Make sure the valve's handle is set to connect the sensor to the vapor vent stack as shown in Figure 7 and <br /> ' not to the capped (vent) port. <br /> 23. Install two tamper-resistant screws from the enclosure hardware bag into the two holes on the enclosure <br /> door (if not already installed) using a Torx bit for tamper-resistant screws. Discard any remaining items in the <br /> enclosure hardware bag. <br /> 24. When direct wiring to a TLS console, install 1/2" electrical conduit from the conduit hub in the bottom of the <br /> enclosure to the customer supplied weather-proof junction box (see Figure 6). For wireless installations, using <br /> the TLS RF, Steps 23 - 27 are not required. <br /> 25. Route the cable from the pressure sensor to the junction box under the enclosure. Observing polarity, <br /> connect the sensor wiring to the field wiring from console and cap with wire nuts (see Figure 6). <br /> 26. Seal wire nuts in epoxy sealant following the instructions in Figure 4. <br /> 27. Push the epoxy sealed bag into the junction box. Replace and tighten the junction box cover. <br /> 28. Terminate field wiring into TLS Console and connect to Smart Sensor Module (TLS console - Figure 5). Note: <br /> observe polarity! The cable length between the console and sensor must not exceed the distance stated in <br /> the TLS-3XX Site Prep manual (P/N 576013-879).\ <br /> 29. After the Pressure Sensor is installed, pressurize the tank ullage space and vapor piping to at least 2 inches <br /> WC and test for leaks using leak detection solution. <br /> 30. Close the enclosure door and secure by threading the tamper-resistant screws into the enclosure body using <br /> a Torx bit for tamper-resistant screws. <br /> 31. Affix the eVRgreen label (item 4 in Table 4) to the enclosure door as desired. <br /> JAN 1. <br /> ��.-tom ` ° ." <br /> •e <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.