My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
2300 - Underground Storage Tank Program
>
PR0231532
>
INSTALL_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2021 10:24:33 AM
Creation date
11/8/2018 10:24:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0231532
PE
2351
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
01
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS3\C\CAMBRIDGE\16470\PR0231532\INSTALL 2018.PDF
QuestysFileName
INSTALL 2018
QuestysRecordDate
7/2/2018 8:57:03 PM
QuestysRecordID
3932889
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pno <br />viber Glass SystemsI Completion & <br />Production Solutions <br />October 17, 2018 <br />Site Location: <br />City Food & Liquor <br />16470 Cambridge Dr. <br />Lathrop, CA. 95330 <br />Per the general installation instructions, minimum clearance on pipe crossings is 2.5". In a situation <br />where 2.5" is not possible, crossings need to be padded with 1/2" or thicker rubber needs to be <br />placed over the top of the lower pipe in the assembly. Make sure rubber padding is in place on all <br />potientail contact points.The bedding of the pipe must be done properly and special attention <br />must be paid to make sure padding remains in place during the backfill process. The 2.5" clearance <br />must be met on all pipe crossings, or the pipe padded per our instructions to satisfy NOV's <br />requirements. The workmanship and execution of the above is solely the responsibility of the <br />contractor. <br />Respectfully yours, <br />Mrs. Lisa Blassingame <br />Western Regional Sales Manager- Fuel Handling <br />E <br />N� <br />T 210-842-5777 915 Audra St. <br />F 210-247-0598 Cedar Park, Texas 78613 <br />Lisa.BlassingameCa�nov.co m <br />7 <br />IAN 0 3 2019 <br />ENVIRONMENTAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.