Laserfiche WebLink
'iber Glass Systems F[igy <br />I Completion & <br />Production Solutions <br />October 17, 2018 <br />Site Location: <br />City Food & Liquor <br />16470 Cambridge Dr. <br />Lathrop, CA. 95330 <br />Per the general installation instructions, minimum clearance on pipe crossings is 2.5". In a situation <br />where 2.5" is not possible, crossings need to be padded with 1/2" or thicker rubber needs to be <br />placed over the top of the lower pipe in the assembly. Make sure rubber padding is in place on all <br />potientail contact points.The bedding of the pipe must be done properly and special attention <br />must be paid to make sure padding remains in place duringthe backfill process. The 2.5" clearance <br />must be met on all pipe crossings, or the pipe padded per our instructions to satisfy NOV's <br />requirements. The workmanship and execution of the above is solely the responsibility of the <br />contractor. <br />Respectfully yours, <br />Mrs. Lisa Blassingame <br />Western Regional Sales Manager - Fuel Handling <br />T 210-842-5777 915 Audra St. <br />F 210-247-0598 Cedar Park, Texas 78613 <br />Lisa. Blassi nga me0anov. corn <br />JAN c1 <br />