Laserfiche WebLink
SWRCB,January 2002 Page_of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer Industry Standard Professional Engineer <br /> Other(Specify -- <br /> Test Method Used: X Pressure Vacuum Hydrostatic <br /> Other(Spec) -----I <br /> Test Equipment Used: Pressure Gauges in Psi 'trogen Equipment Resolution: 110-I Psi <br /> Piping Run#1 Piping Run#2 Piping Run 93 Piping,Rung <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" Y <br /> Length of Piping Run: Approx. 120' Approx. 110' Approx. 130' <br /> Product Stored: Regular 87 Super 91 Diesel <br /> Method and location of Test boot at STP Test boot at STP Test boot at STP <br /> i in -run isolation: Piping Sump#1 Piping Sump 42 -Piping Sump#3 <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes <br /> pressure and starting test: --- <br /> Test Start Time: 9:35 9:25 9:15 <br /> Initial Reading(Rt): 5 Psi 5 Psi 5 Psi <br /> Test End Time: 10:35 10:25 10:15 <br /> Final Reading(RF): 5 Psi 5 Psi 5 Psi <br /> Test Duration: rNodetectable <br /> I Hour I Hour <br /> Change in Reading(Rr-Rt): Eloss <br /> 0 Psi 0 Psi <br /> Pass/Fail Threshold or No detectable loss No detectable loss <br /> Criteria <br /> Tat Rmsli Pass Pass Pass <br /> Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />