My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
2300 - Underground Storage Tank Program
>
PR0231060
>
COMPLIANCE INFO_2017 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:48 PM
Creation date
11/8/2018 10:25:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017 - 2018
RECORD_ID
PR0231060
PE
2361
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
01
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\D\DR MARTIN LUTHER KING JR\749\PR0231060\COMPLIANCE INFO 2017 -PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2017 -PRESENT
QuestysRecordDate
3/28/2018 9:47:28 PM
QuestysRecordID
3839032
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page_of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer Industry Standard Professional Engineer <br /> Other(Specify -- <br /> Test Method Used: X Pressure Vacuum Hydrostatic <br /> Other(Spec) -----I <br /> Test Equipment Used: Pressure Gauges in Psi 'trogen Equipment Resolution: 110-I Psi <br /> Piping Run#1 Piping Run#2 Piping Run 93 Piping,Rung <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" Y <br /> Length of Piping Run: Approx. 120' Approx. 110' Approx. 130' <br /> Product Stored: Regular 87 Super 91 Diesel <br /> Method and location of Test boot at STP Test boot at STP Test boot at STP <br /> i in -run isolation: Piping Sump#1 Piping Sump 42 -Piping Sump#3 <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes <br /> pressure and starting test: --- <br /> Test Start Time: 9:35 9:25 9:15 <br /> Initial Reading(Rt): 5 Psi 5 Psi 5 Psi <br /> Test End Time: 10:35 10:25 10:15 <br /> Final Reading(RF): 5 Psi 5 Psi 5 Psi <br /> Test Duration: rNodetectable <br /> I Hour I Hour <br /> Change in Reading(Rr-Rt): Eloss <br /> 0 Psi 0 Psi <br /> Pass/Fail Threshold or No detectable loss No detectable loss <br /> Criteria <br /> Tat Rmsli Pass Pass Pass <br /> Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.