My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
2300 - Underground Storage Tank Program
>
PR0231060
>
COMPLIANCE INFO_2017 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:48 PM
Creation date
11/8/2018 10:25:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017 - 2018
RECORD_ID
PR0231060
PE
2361
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
01
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\D\DR MARTIN LUTHER KING JR\749\PR0231060\COMPLIANCE INFO 2017 -PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2017 -PRESENT
QuestysRecordDate
3/28/2018 9:47:28 PM
QuestysRecordID
3839032
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: Sump Manufacturer Industry Standard X Professional Engineer <br /> Other(.Speci ) <br /> Test Method Used: Pressure Vacuum X Hydrostatic <br /> Other(Spec�j <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> Sump# 1-87 Sump#2-91 Sump#3-Diesel Sump# <br /> Sump Diameter: 44" 44" 44" <br /> Sump Depth: 39" <br /> 39" 37 Y.., --... <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of <br /> -Highest Piping Penetration: 19 18" 12" <br /> Height from Tank Top to Lowest <br /> ElectricalPenetration: I I' 23" 22" <br /> Condition of sump prior to testing: Dry Dry Dry <br /> Portion of Sump TestedWater Line 25" Water Line 27" Water Line 26" <br /> Does turbine shut down when <br /> ,sump sensor detects liquid(both Yes Yes Yes <br /> product and water)?' <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail-safe <br /> shutdown?' Yes Yes Yes <br /> Was fail-safe verified to be <br /> operational?' No No No <br /> Wait time between applying water <br /> and starting test: 5 Minutes 5 Minutes 5 Minutes <br /> Test Start Time: 10:52 10:07 9:22 <br /> Initial Reading(Ri): .001 .001 .001 <br /> Test End Time: 11:22 10:37 9:52 <br /> Final Reading(RF): .001 .001 <br /> .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-Ri): 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> Test Result: Pass Pass Pass <br /> Was sensor removed for testing? Yes Ve9 Yes <br /> Was sensor properly replaced and <br /> verified functional after testing? Yes Yes Yes <br /> Comments—(include information on repairs made prior to resting and recommended ollow up%r piled tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to an of the questions indicated with an <br /> asterisk * 1 <br /> O is"NO"or"NA",the entire sump must be tested. (See S W RCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.