Laserfiche WebLink
SWRCB,January 2002 Page_of <br /> S. FILL RISER CONTAINMENT SUMP TESTING <br /> Facility is Not Equipped With Fill Riser Containment Sums X <br /> Fill Riser Containment Sumps are Present,but were of Tested <br /> Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer <br /> Other(Specili) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(q?eciA,) <br /> Test Equipment Used: Equipment Resolution: <br /> n Fill Sump# Fill Sump# Fill Sump# Fill Sump# <br /> Sump Diameter: <br /> Sump Depth: <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to <br /> testing: <br /> Portion of Sump Tested <br /> Sump Material: <br /> Wait time between applying <br /> water and starting test: <br /> Test Start Time: <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Chane in Reading Rr-R, : <br /> Pass/Fail Threshold or Criteria: <br /> Test Resuk: <br /> Is there a sensor in the sump? <br /> Does the sensor alarm when <br /> either product or water is <br /> detected? <br /> Was sensor removed for testing? <br /> Was sensor properly replaced and <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior w iesting, and recommended 1ollou-up forfailed tests) <br /> 4 <br />