Laserfiche WebLink
SWRCB,January 2002 Page_of <br /> 9. SPILLIOVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped W ith Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested X 'See comments <br /> Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(.S�ecih�l <br /> Test Equipment Used: Equipment Resolution: <br /> hitj Spill Roc # Spill Box # Spill Box# Spill Box # <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: _ <br /> Test Start Time: <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Pinal Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Ri): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test ResaR <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> *Spill/Overfrll Containment boxes tested annually with,Monitoring System Certification. <br /> .--- -._._...___...__._.............. .M. <br />