Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN —(Page 2 of 2 <br /> VI. UNDER DISPENSER CONTAINMENT(UDQ MONITORING -a <br /> hat <br /> rMCONTINUOUS <br /> ORING IS PERFORMED USING THE FOLLOWING METHODS) <br /> ELECTRONIC MONITORING X 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONICSTAND-ALONESPENSE IS ❑ 99.OTHER S— _ _ ___. _ _-.__ ( pecify) a90.14b <br /> AK MONITOR MANUFACTURER: a9oss MODELM: e96-<a <br /> AK SENSOR MANUFACTURER: 4�17 MODEL N(S): sa-ss <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES X b.NO d90'a9 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN, a YES X b.NO 4". <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES X b.NO 48661 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. _ __ X a VES ❑ b.NO 490'62 <br /> UDC CONSTRUCTION IS: X I.SINGLE WALL ❑ 2.DOUBLE WALL °00-61 <br /> IF WLByp WAt 1: <br /> go W. <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a LIQUID ❑ It PRESSURE ❑ C.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF I HE UDC-IRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a YES ❑ b.NO 49 1, <br /> VII. PERIODIC SYSTEM TESTING <br /> I.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT FNHANCFp 49obs <br /> MUST BE PERFORMED. PERIODIC L'LD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.m GGR <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 4W 66 <br /> ® 3.SPILL BUCKETS ARF.TESTED ANNUALLY. a9a.6r <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept fm this facility: a9a6e <br /> ® a ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS j <br /> ❑ d-SIR TESTING RESULTS(and supporting documentation records) ❑ C.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ L ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.E UIPMENT MAINTENANCE AND'A'—RATION RECORDS <br /> IX. TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all ofthe following documents relevant to their job duties: a9o.69. <br /> REFERENCE DOCUMENTS MAINTAINED.AT FACILITY(Check all that app(v) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 4y <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 49aa99 <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49 4 <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 49a69a <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490.69!' <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 49 sa <br /> ❑ OTHER(Specify). <br /> 9069n <br /> 9Ud9i <br /> This facilityhas a"Designated UST Operator"who has passed the California UST System Operator Exem administered by the In[emmional Code Council s9a.ro ' <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST syswms annually,and within 30 <br /> days of hire.This training will include•but is not limited to,the fallowing: <br /> Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> > The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> > The facility employee's rate with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> > Name(s)of contact persons)for emergencies and monitoring alombs. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 4�t1 <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detectio;equilancil covered <br /> lan occurs;2_)all conditions that_nd cate a possiblerelease are invested;and 3.)alI maniratingrecords are maintained Droperly.THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE:NAME: Guillermo Lopez 490.12. TITLE.ManagerNAME: Sandy Edwards i90-1JTITLE:Environmental Compliance Admin. A9075 <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the operamr of any <br /> conditions that need follow-up action. <br /> XII, OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION: 1 certify that the information provided herein is true and accurate to the best of my knowled e. <br /> APPLICANT SIGNATURkt�) r I DATE: a9o-n <br /> \\ ' LC�-� 6/8/09 <br /> RF3RESEY, NG Xi TaNO ,, rut 2.Faile Own iar J AutMrimd imw ofOwnv a90.r6. <br /> UPCF UST-D(122007)-418 www.unldocs.org <br />