Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN — (Page 2 of 2 <br /> VI. UNDER DISPENSER CONTAINMENT(UDC)MONITORING (Chaekarl <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) tlr� <br /> ❑ L CONTINUOUS ELECTRONIC MONITORING X 2.FLOAT AND CHAIN ASSEMBLY490-544 <br /> ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑ 4.NO DISPENSERS _ _ ❑ 99,OTHER(Specify) <br /> LEAK MONITOR MANUFACTURER: 4995 eao:4e- <br /> MODEL g: <br /> LEAK SENSOR MANUFACTURER: 41)0-sv. MOUEL .90-58q(S) osa <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS : 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN, ❑ a.YES X b.NO <br /> a YES X b.NO 4004440044o <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a YES X K b.NO "P°t <br /> _ UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. 99ae: <br /> UDC CONSTRUCTION IS.- _ - _ X a.YES ❑ b.NO <br /> I.SINGLE WALL _._.._. ..—--__ <br /> IF DOUBLE WALL:: ❑ 2.DOUBLE WALL __—_ +9n-m <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: _ PRESSURE <br /> 0 C.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF T❑HE UDC TRIGGERS AUDIBLE bAND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490� <br /> VII. PERIODIC SYSTEM TESTING <br /> ❑ L ELTESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WgTER RESOURCES CONTROL BOAKD THAT ENHANCE n 490-65 <br /> MUST BE PERFORMED. PERIODIC EI D IS PERFORMED EVERY 36 MONTHS AS RE UIRED,123CMJ1) <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE"TESTED EVERY 36 MONTHS. 49466 <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY_ waT <br /> VIII. RECORD KEEPING <br /> The Following monitoring/maintenance records are kept far Nis facility: <br /> ® a ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS 49o-6s <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f.ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® K E UIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant[o Meirjob duties: <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) 49a,69a <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Requf r d) <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 49069p <br /> El49 CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 11490-6%CALIFORNIA UNDERGROUND STORAGE TANK LAW 49oe% <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 4at-Wr <br /> STATISTICAL INVENTORY RECONCILIATION' <br /> ❑ SWRC13 PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 49os9a. <br /> ❑ OTHER(Specify) <br /> 49osm, <br /> UC facility hes a"Designated UST Operator"who has passed the California UST System Operator Hxam administered b the Inremationat Code Council 490470 <br /> y 49oro <br /> (ICC). The `Designated UST Operator"wil I train facility employees in the proper operation and maintenance of the US'T systems annually,and within 30 <br /> days of him.This training will include,bra is not limited to,the following: <br /> > Operation of the UST systems in a manner consistent with the facility's best management prectics,, <br /> > The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> Y The facility employee's role with regard in spills and overfills as specified in the facility's UST Response Plan. <br /> Name(s)of contact pmmn(s)for emergencies and monitoring alarms. <br /> X COMMENTS/ADDITIONAL INFO"leakdelmlion <br /> N <br /> [Pir,0"deadditional comments here or indicate how many pages with additional information on specific monures ere attached m this plat. 490-]1l mwnvutm If a OPW Bt tope Mr upl¢ea a n vrve to raver ovwalb. TM vrve is sr at 95% it rlat6 Cbaed.XL PERSONNEL RESPONSIBILIThe UST Owt¢r/ numisrespomible forensuring that: L)the dailyiroutine UST monitoring activities nce of UST leak detectionb Nis Ian«curs;2all conditions that indicate a ssible release ere i3. all monitorin aintained d equipment wvetedTHE FOLLOWING PERSONS)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND MAINTENANCE:NAME' Guillermo Lo 49URPez rITLE:Manaera9o.rs <br /> NAME: Sand Edwards 490'4 TITLE:Environmental Com 11ance Admin. 4W75 <br /> The Designated UST Oshall perform a monthly visual <br /> conditions that need follow-up <br /> action. inspection of the facility,provide a report to the owaerlopvator,and inform the owner/operetor of any <br /> __ <br /> XII. OWNER/OPERATOR SIGNATURE <br /> rAPPLICA—NTSIGNATU <br /> TIFICATION:1 certi that the information provided herein is true and accurate to the best of m knowledge. <br /> PATE: 4w.n <br /> 2 6/8/09 <br /> ENrrMr.X 1.Trak C) 1 IJFFaalu l m )wutMrizM tw.a arO.er 49676 <br /> UPCF UST-D(12/2007)-JB www.unidomorg <br />