My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14000
>
2300 - Underground Storage Tank Program
>
PR0231631
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:33 AM
Creation date
11/8/2018 10:26:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231631
PE
2361
FACILITY_ID
FA0000091
STREET_NUMBER
14000
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
01
SITE_LOCATION
14000 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\E\HWY 88\14000\PR0231631\COMPLIANCE INFO 2016- PRESENT .PDF
QuestysFileName
COMPLIANCE INFO 2016- PRESENT
QuestysRecordDate
5/18/2017 8:47:48 PM
QuestysRecordID
3387540
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING SYSTEM CERTIFICA 1 <br /> APR 13 2017 <br /> CERTIFICATION / TEST DATE: April 12, 2017 <br /> Al. FACILITY A2. OWNER ENVIRON <br /> Name Colonial Energy 1740138 Name Colonial Energy, LLC. DEPARTMENT <br /> Address 14000 E.Hwy.88,Lockeford,CA 95237 Address 2860 N.Santiago Blvd.2nd Floor,Orange,CA 92667 <br /> Phone# 916-285-7402 Phone# 714-761-5426 <br /> Contact Station Manager Contact Victor Hassan <br /> D. RESULTS OF TESTING / SERVICING <br /> Make / Model of Monitoring System: Veeder-Root TLS-350 SN# 10914077008001 <br /> Software Version Installed: 328.03 <br /> Complete the following checklist: <br /> ■ Yes ❑ No* Is the audible alarm operational? _ <br /> ■ Yes I ❑ No* Is the visual alarm operational? <br /> ■ Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ■ Yes ❑ No• Were all sensors installed at lowest point of secondary containment and positioned so that other equipment <br /> will not interfere with their proper operation? <br /> j ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modems) <br /> ■ WA operational? <br /> ■ Yes ❑ No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑ NIA monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate <br /> positive shutdown? (check all that apply) ■ Sump/Trench sensors; ■ Dispenser Containment Sensors. <br /> ■ Yes ❑ No* Did you confirm positive shut-down due to leaks and sensor failure/disconnection? <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no <br /> ■ WA mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? _% <br /> ❑ Yes* ■ No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ■ Yes* ❑ No Was any liquid found Inside any secondary containment systems designed as dry systems? <br /> (Check all that apply) ❑ Product; ■ Water. If yes,describe causes in Section E,below. <br /> ■ Yes ❑ No* Was monitoring system set-up reviewed to insure proper settings? Attach set-up reports,If applicable. <br /> ■ Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. COMMENTS <br /> (>2017 Walton Engineering,Inc. <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.