My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14000
>
2300 - Underground Storage Tank Program
>
PR0231631
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:33 AM
Creation date
11/8/2018 10:26:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231631
PE
2361
FACILITY_ID
FA0000091
STREET_NUMBER
14000
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
01
SITE_LOCATION
14000 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\E\HWY 88\14000\PR0231631\COMPLIANCE INFO 2016- PRESENT .PDF
QuestysFileName
COMPLIANCE INFO 2016- PRESENT
QuestysRecordDate
5/18/2017 8:47:48 PM
QuestysRecordID
3387540
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING SYSTEM CERTIFICA lb 13 2017 <br /> CERTIFICATION / TEST DATE: April 12, 2017 <br /> Al. FACILITY A2. OWNER <br /> Name Colonial Energy#40138 Name Colonial Energy, LLd)EPARTMENT <br /> Address 14000 E.Hwy.88, Lockeford,CA 95237 Address 2860 N.Santiago Blvd.2nd Floor,Orange,CA 92867 <br /> Phone# 916-285-7402 Phone# 714-761-5426 <br /> Contact Station Manager Contact Victor Hassan <br /> F. IN-TANK GAUGING /SIR EQUIPMENT: ■ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gaugung equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No• Has all input wiring been inspected for proper entry and termination,including testing for ground faults? _ <br /> ❑ Yes ❑ No' Were all tank gauging probes visually Inspected for damage and residue buildup? <br /> ❑ Yes ❑ No' Was accuracy of system product level readings tested? _ <br /> ❑ Yes ❑ No• Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No-* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ■ Yes ❑ No. For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ❑ NIA (check all that apply) Simulated leak rate: ■ 3g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br /> ■ Yes ❑ No* Were all LLD*confirmed operational and accurate within regulatory requirements? <br /> ■ Yes ❑ No a Was the testing apparatus property calibrated? <br /> ■ Yes ❑ No' For mechanical LLDs,does the LLD restrict product flow If it detects a leak? <br /> ❑ WA <br /> ❑ Yes ❑ No• For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ■ WA <br /> ❑ Yes ❑ No. For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ■ WA or disconnected? <br /> ❑ Yes ❑ No• Forelectronic LLDs,does the turbine automatically shutoff if any portion of the monitoring system malfunctions <br /> ■ WA or fails a Last? <br /> ❑ Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually Inspected? <br /> ■ N/A <br /> ■ Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. COMMENTS <br /> 0 2017 Walton Engineering,Inc. <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.