Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Page i of 2) <br />TYPE OF ACTION ❑ 1- NEW PLAN 2. CHANGE OF INFORMATION <br />490-1 <br />PLAN TYPE K 1. MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />490-2 <br />(Check one item only) ❑ 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- <br />L FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) Ti 1-1_ <br />1 <br />BUSINESS NAME (Same as FACILITY NAME)Ctjea 6 14 7-- <br />3. <br />BUSINESS SITE ADDRESS 0' A 103.CITY _5 r>G/�TOAlq_��'e04 <br />IL EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak deter -tris, rcry <br />specified by the equipment manuhwWrers' , or annually, whichever is more frequent, and that such work m el. <br />23 CCR §263Z 2634 2638 2641 <br />MONITORING EQUIPMENT IS SERVICED I. ANNUALLY [j 99. 99.OTHER S eci 2 U Iv <br />490-36 490-3b <br />III. MONITORING LOCATIONS <br />cl 1. NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 2. SITE PLOT PLAN/MAP PREVI6NVftNMVtb. t0aft632, <br />2634 so -a PMMITIRBVIGES <br />IV. TANK MONITORING IS PERFORMED USING THE FOLLOWIN <br />1. CONTINUOUS ELECTRONIC TANK MONITORING OF <br />490.5 <br />VAULT(S) WITH AUDIBLE AND VISUAL ALARMS (23 CCR §2632,2634) <br />SECONDARY CONTAINMENT' IS: Era. DRY b. LIQUID FIL1.ID ❑ c- PRESSURIZED [3d. UNDER VACUUM <br />4` 0-6 <br />PANEL MANUFACTURER: e e 0 7 I MODEL # O <br />a90 -s <br />49D-9. <br />LEAK SENSOR MANUFACTURER: B OOtI MODEL #(S): PO- <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANKin (23 CCR §2643) <br />49011 <br />PANEL MANUFACTURER: 490-12 MODEL #: <br />490-13 <br />IN -TANK PROBE MANUFACTURER- 490-14. MODEL #(S):� _ _ <br />490-15 <br />- LEAK TEST FREQUENCY: ❑ a. CONTINUOUS - ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />490-16 <br />❑ d. MONTHLY ❑ e. OTHER (Specify): - ---- <br />490-17 <br />PROGRAMMED TESTS: ❑ a. 0.1 g p.h. b- 02 g p.h. ❑ c. OTTER (Specify): <br />4990--19 <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATIGN (23 CCR <br />490.20 <br />f-14. WEEKLY MANUAL TANK GAUGING (MTG) (23 CCR §2645 TESTING PERIOD: ❑ a- 36 HOURS ❑ b- 60 HOURS <br />490-21 <br />490_?2 <br />5. TANK INTEGRITY TESTING (23 CCR §2643.1): <br />490.23 <br />TEST FREQUENCY:,,& ANNUALLY Elb-BIENNIALLY El c. OTHER (Specify): <br />y�25 <br />490-26 <br />❑ 99. OTHER (Specify): <br />490.27 <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />�I 1. CONTINUOUS MONITORING OF PIPE! P1P1<1Vf2 cr rennrc% ♦ wtn n-rrrco ec-wtn • ov r-wrr • iwrwrcwrr vrvrr: •smtr.. o w D <br />400-28 <br />VISUAL ALARMS (23 CCR §2636) <br />490 z9 <br />SECONDARY CONTAINMENT IS: DRY 19b. LIQUID FILLED [1c. PRESSURIZED [1d. UNDER VACUUM <br />PANEL MANUFACTURER: eP 'i - 491x0 i MODEL #: ,L 3 s-0 <br />490-31 <br />♦... t ✓ Il 490-32 ,.....-. .,.«. `7Q / # -P P 'i r. <br />LEAN: Si:`t iJvn ivwi�urri� i vi u.. r C ' rr ' \.. __ %_". - - - - <br />490-33 <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (Le., TURBINE) SHUTDOWN. 14 a. YES ❑ b. NO <br />490-35 <br />GRING SYSTEM TRIGGERS AUTOMATIC PUMP SHU0WN. X a. YES ❑ b. NO <br />FAILURE/DISCONNECTION OF The ,401.4TTTD3 <br />490-35 <br />�. "' • " ..• - • - •----: - - •-- --•- .-- �. '-� •= -' ` -M �•'T �'FI-`TR-I � OR SHUTS OFF <br />2. MECHANICAL LINE LEAK DETECT .,,...�.�.,. ��rr <br />V <br />PRODUCT FLOW WHEN A LLAK IS ax. i Lu s L"A$ (:i xv <br />490-36 <br />490 37 MODEL #(S): <br />MLLD MANUFACTURER(S): ReJ Q.GKe <br />490-34 <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g,p.h. LEAK TESTS (23 CCR §2636) <br />490-39 <br />ELLD MANUFA S 49D•40. MODEL #(S): <br />49041 <br />PROGRAMMED IN LINE LEAK TEST: ❑ 1. MINIMUM MONTHLY 02 g p.h. ❑ 2. MINIMUM ANNUAL 0.1 g pA <br />M <br />490.42 <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. * a. YES [Ib. NO <br />C <br />490'43 <br />ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. % a. YES ❑ b. NO <br />490-44 <br />4. PIPE IN TEGRITi' TEv'TING 490.45 <br />TEST FREQUENCY W a. ANNUALLY El b. EVERY 3 YEARS ❑ c_ OTHER S 490-464 -4 <br />5. VISUAL PIPE MONITORING. <br />49048 <br />FREQUENCY A a. DAILY ❑ b. WEEKLY ❑ c_ MIN. MONTHLY & EACH TIME SYSTEM OPERATED* <br />490-49 <br />• Allowed for momtoj%F. of unburied em env gmmwr fuel piping mly per HSC §25281.5(b)(3) <br />❑ 6. SUCTION PIPING MEET'S EXEMPTION CRITERIA 123 CCR §2636(a)(3)1. <br />490-50 <br />7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br />490-51 <br />490-52 <br />❑ 99. OTHER (Specify) <br />490-53 <br />UPCF UST -D (1212007)1/4 <br />