Laserfiche WebLink
UNIFI7E7�D=PROGRAM CONSOLIDATED7KFORM- <br />MONITORING PLAN (Page 2 of 2) <br />VL UNDER DISPENSER CONTAINMENT (UDC) MONITORING <br />1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490.54a <br />490.546 <br />® 1. CONTINUOUS ELECTRONIC MONITORING ❑ 2- FLOAT AND CHAIN ASSEMBLY ❑ 3- ELECTRONIC STAND-ALONE <br />❑ 4. NO DISPENSERS [199. OTHER (Specify): <br />PANEL MANUFACTURER 4w" <br />MODEL #: � 490-56. <br />LEAK SENSOR MANUFACTURER:490-57 <br />s <br />MODEL #(S): D ^&ZI Z <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS (9 a. YES ❑ b. NO 4 59 <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN W a. YES ❑ b. NO 490-60. <br />FAILURE / DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. Qg a. YES ❑ b. NO 490-61 <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. a. YES ❑ b. NO 490-62 <br />2. UDC CONSTRUCTION IS ELI. SINGLE -WALLED ❑ 2. DOUBLE -WALLED 490.63 <br />IF DOUBLE WALLED 490-64" <br />UDC INTERSTITIAL SPACE IS MONITORED BY: 0 1. LIQUID 0 2- PRESSURE Q 3. VACUUM <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a YES ❑ b. NO 490.64b <br />VIL PERIODIC SYSTEM TESTING <br />❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br />AK DETECTION D MUST BE PERFORMED. PERIODIC ELD IS PERFORM M EVERY 36 MONTHS AS CCR 2644. I <br />192. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS 490 G6 <br />19 3. SPILL BUCKETS ARE TESTED ANNUALLY. 490-67 <br />VIM RECORDKEEPING <br />The following monitoring/maintenance records are kept for this facility: <br />Alarm logs 49"m RVisual Inspection Records 49o4sb j&Tank integrity testing results 49o-6Sc <br />SIR testing results (and supporting documentation records). 49"M ❑ Tank gauging results (and supporting documentation records). 49"8e <br />ATG Testing results (and supporting documentation records). 4go-W ❑ Corrosion Protection 60 -day logs 490-68S <br />Equipment maintenance and calibration records. 490-M <br />IX. TRAINING <br />$� Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490.69, <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />® THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) 49"% <br />® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) 49o -69c <br />CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49a69d <br />CALIFORNIA UNDERGROUND STORAGE TANK LAW 49"ge <br />STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION" 49" f <br />❑ SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490.695 <br />❑ OTHER (Specify): M69h, M6% <br />This facility has a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code Council (ICC). <br />The "Designated UST Operator" will Vain facility employees in the proper operation and maintenance of the UST systems annually, and within 30 days of hire. This <br />training will include, but is not limited to, the following: <br />Operation of the UST systems in a manner consistent with the facility's best management practices <br />➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br />The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br />Names of contact person(s) for emergencies and monitoring alarms. 490-70 <br />X. COMMENTS/ADDITIONAL INFORMATION <br />Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are aftached to this plan. 49x71 <br />�lr �Dr <br />XI. PERSONNEL RESPONSIBILITIES <br />The UST Owner/Operator is responsible for ensuring that: 1) the dailyhoutine UST monitoring activities and maintenance of UST leak detection equipment covered by <br />this plan occurs, 2) all conditions that indicate a possible release are investigated, and 3) all monitoring records are maintained properly. <br />possible for performing monitoring and equipment maintenance: <br />7s <br />The fi 11 1 g person(s) aNAI <br />jIJA P- A re C agar_ TITLE �! ago <br />NAME 490.74 TITLE 490-75 <br />T -he Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br />conditions that need follow-up action. <br />XII. OWNER/OPERATOR SIGNATURE <br />CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br />APPLI NT SIGNATURE 490-76 <br />DATE: ago -77 <br />7 7- <br />REPRESENTING: 1. Tank OWf1CfI ator2 . Faality Owner/O �Yator .:\uthon�ed Re esrntative of veer <br />0-90-78 <br />490-"79 <br />APPLICANT NAME (print) - <br />LIP 411-1 <br />APPLICANT TITLE: <br />Civ 1111C-lz <br />t vA <br />UPCF UST -D (12!2007) 3/4 <br />