My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986 - 2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
2300 - Underground Storage Tank Program
>
PR0231059
>
COMPLIANCE INFO 1986 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 2:21:04 PM
Creation date
11/15/2018 4:19:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 2005
RECORD_ID
PR0231059
PE
2361
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
01
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page Z of <br /> SWRCB, MAY 2002 <br /> 5. SECONDARY PIPE TESTING -- <br /> Test Method Developed by: C) Piping Manufacturer jWlndustry Standard <br /> Professional Engineer <br /> Other(Specify) <br /> Test Method Developed by: <br /> Pressure � Vacuum � Hydrostatic <br /> 0 Other(Specify) <br /> LTst Equipment Used: PRESSURE GAUGE Equipment Resolution: -/psi <br /> Piping Run# <br /> Piping Run# Piping Run#z Piping Run# P g <br /> Piping Material: FRP <br /> Piping Manufacturer: m <br /> Piping Diameter: / h <br /> Length of Piping Run: U O t <br /> Product Stored: P v <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure starting test: A.1 <br /> Test Start Time: �' O a <br /> Initial Reading(R.) s s e - S�� <br /> Test End Time: /;2 0o <br /> Final Reading(RF): S S <br /> Test Duration: O O�Tf <br /> Change in Reading(RF-R,): tom' <br /> Pass/Fail Threshold or Criteria: - O <br /> TEST RESULT: PASS ❑ FAIL PASS � FAIL Q PASS � FAIL � PASS �I FAIL <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.