Laserfiche WebLink
Page :� of <br /> SWRCB, MAY 2002 <br /> 7, UNDER-DISPENSER CONTAINMENT (LDDC) TESTING <br /> UDC Manufacturer Q Industry Standard Q Professional Engineer <br /> Test Method Developed by: Q ft ' <br /> Q Other(Specify) <br /> Hydrostatic <br /> Test Method 1 / Q P:`-'sure <br /> Q Vacuum Q <br /> 1/ Q Oth,r(Specify) <br /> Test Equipment Used: VMI Equipment Resolution: .OS gph <br /> UDC# �— UDC# .5�- � UDC# /' <br /> UDC# '- t t n�Y3c t un tt w. �d w e-K, <br /> UDC Manufacturer: 17 <br /> UDC Materials: � low <br /> .� <br /> UDC Depth: _ <br /> Height from UDC Bottom to Top J� �H is <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical-Penetration: B� <br /> ®�� <br /> Condition of UDC prior to testing: ALL ALL <br /> Portion of UDC Tested: ALL ALL <br /> Does turbine shut down when UDC <br /> sensor detects either product or water? O �� <br /> Turbine shutdown response time: <br /> Is system programmed for <br /> fail-safe shutdown? <br /> Was fail-safe verified to be <br /> operational? <br /> Wait time between applying pressure/ <br /> vacuum/water&starting test: <br /> Test Start Time: <br /> Initial Reading(R,) <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: ® f <br /> Change in Reading(RF-Ri): ,Q <br /> PassjFailhreshold or Criteria: ! PASS Q FAIL PASS Q FAIL <br /> TESLT: PASS PASS Q FAIL <br /> NA <br /> Was sensor removed for testing? es Q No Q NA Yes Q No Q NA ( Yes Q No Q NA Yes Q No Q <br /> Was sensor properly replaced g Yes Q No Q NA Yes Q No Q NA q]Yes Q No Q NA 0,Yes Q No Q NA <br /> verified functional after testin <br /> CoMments—(include information on repairs made prior to testing, and recommended,follow-up for failed tests) <br />