Laserfiche WebLink
Page 4—of <br /> 3WRCB, MAY 2002 <br /> 6, PIPING SUMP TESTING §4 Professional Engineer <br /> Sump Manufacturer <br /> industry Standard <br /> Test Method Developed by: C3 Other(Specify)C3 Pressure Hydrostatic <br /> Vacuum <br /> Test Method Developed by: C) Other(Specify) <br /> Equipment Resolution: .05 gph <br /> Test Equipment Used: VMI Sump# <br /> Sump# <br /> Sump# 61r/ ump# <br /> cs 7 <br /> Sump Diameter <br /> Sump Depth <br /> Sump Material: �r <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: ' <br /> Height from Tank Top to Lowest <br /> Electrical-Penetration: <br /> to testing: O <br /> Condition of sump prior <br /> Portion of Sump Tested: <br /> Does turbine shut down when sump 0 <br /> sensor detects either product or water? <br /> Turbine shutdown response time: <br /> Is system programmed for <br /> fail-safe shutdown? <br /> Was fail-safe verified to be <br /> operational? <br /> Wait time between applying pressure/ a �f <br /> Oi.r T1 <br /> vacuum/water&starting test: <br /> Test Start Time: <br /> Initial Reading(R1) <br /> Test End Time: <br /> Final Reading(RF): <br /> s+✓1f <br /> Test Duration: <br /> Change in Reading(RF-Ri): <br /> •Of y � PASS [! FAIL <br /> pass/Fail Threshold or Criteria: 'OS per' PASS C3 FAIL' L) PASS Q FAIL <br /> PASS FAIL C3 NA C3 Yes C]No C)NA <br /> TEST RESULT: Yes[3 No NA LJ Yes No,� <br /> Was sensor removed for testing? Yes NO t]NA Q NA C3 Yes C3 No C3 NA <br /> YesC3NoONA Yes C1NoNA �Yes�No <br /> Was sensor properly replaced & <br /> verified functional after testing? follow-up or failed tests) <br /> Comments— i►zclude information on repairs made prior to testing, and recommended f p f <br />