My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
2300 - Underground Storage Tank Program
>
PR0231059
>
COMPLIANCE INFO 2006 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 3:50:24 PM
Creation date
11/16/2018 10:45:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2012
RECORD_ID
PR0231059
PE
2361
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
01
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />7. CINDER -DISPENSER CONTAINMENT (UDQ TESTING <br />Page of <br />Test Method Developed By: ❑ UDC Manufacturer Industry Standard X Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum X Hydrostatic <br />❑ Other (Spec6) <br />Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br />UDC # 1&2 <br />UDC # 3&4 <br />UDC # 5&6 <br />UDC # 7&8 <br />UDC Manufacturer: <br />Total Containment <br />Total Containment <br />Total Containment <br />Total Containment <br />UDC Material: <br />Poly Plastic <br />Poly Plastic <br />Poly Plastic <br />Poly Plastic <br />UDC Depth: <br />26" <br />34" <br />27" <br />34" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />14" <br />14" <br />14" <br />14" <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />11 " <br />13" <br />15" <br />15" <br />Condition of UDC prior to <br />testing: <br />Dry <br />Dry <br />Dry <br />Dry <br />Portion of UDC Tested <br />Water Level 16" <br />Water Level 17" <br />Water Level 16" <br />Water Level 17" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?* <br />Yes <br />Yes <br />Yes <br />Yes <br />Turbine shutdown response time <br />Not Alarmed <br />Not Alarmed <br />Not Alarmed <br />Not Alarmed <br />Is system programmed for fail- <br />safe shutdown?* <br />Yes <br />Yes <br />Yes <br />Yes <br />Was fail-safe verified to be <br />operational?* <br />No <br />No <br />No <br />No <br />Wait time between applying <br />water and starting test <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />Test Start Time: <br />9:25 <br />9:15 <br />9:05 <br />8:55 <br />Initial Reading (Ri): <br />.001 <br />.001 <br />.001 <br />.001 <br />Test End Time: <br />9:55 <br />9:45 <br />9:35 <br />9:25 <br />Final Reading (RF): <br />.001 <br />.001 <br />.001 <br />.001 <br />Test Duration: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Change in Re ding RF-Ri : <br />0 <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />.005/30 Minutes <br />.005/30 Minutes <br />.005/30 Minutes <br />Test Result: <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />Was sensor removed for testing? <br />X Yes —� No ❑ NA <br />X Yes "I No ❑ NA <br />X Yes ❑ No Li NA <br />X Yes ❑ No . NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />X Yes ❑ No ❑ NA <br />X Yes 7 No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No -NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.