Laserfiche WebLink
SWRCB, January 2002 Pace of <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes <br />Spill/Overfill Containment Boxes <br />are Present, but were Not Tested X <br />(See Comments!) <br />Test Method Developed By: <br />J Spill Bucket Manufacturer <br />❑ Other (Spec) <br />Industry Standard J Professional Engineer <br />Test Method Used: <br />❑ Pressure <br />❑ Other (Spec) <br />❑ Vacuum ❑ Hydrostatic <br />Test Equipment Used: <br />Bucket Diameter: <br />Spill Box # Spill Box # <br />Equipment Resolution: <br />Spill Box # Spill Box # <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (RI): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-Ri): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />❑ Pass ❑ Fail ❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments —(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Spill/Overfill Boxes Tested annually with Monitoring System Certification. <br />