Laserfiche WebLink
P. 1 <br />Communication Result Report ( Jun, 19. 2011 10:03AM ) * * * <br />1) San Joaquin County <br />2) Environmental Health Department <br />Date/Time: Jun,19. 2012 9:57AM <br />File Page <br />No, Mode Destination Pg (s) Result Not Sent <br />---------------------------------------------------------------------------------------------------- <br />0090 Memory TX 94616^142 P. 2 OK <br />---------------------------------------------------------------------------------------------------- <br />Reasonfor <br />error <br />E.1) <br />Hang up or <br />line fail <br />E.2) Busy <br />E.3) <br />No answer <br />E.4) No facsimile <br />connection <br />E.5) <br />Exceeded max. E —mail <br />size <br />San Joaquin County <br />Environmental Health Department <br />°' EOTON <br />Drw woM,rxEes <br />7868 East Hazelton Avenue <br />' <br />Stockton, California 952056232 <br />PROGAAiU +ATU S <br />R- Wool--119 <br />• • <br />Jeri C-- REM9 RDI <br />E. ;�_ :'' <br />li�o'A7` <br />Wetrarta: <br />No sey F.11 RENS <br />Norio Tuduee. RENS <br />(209)498-wg/ehd <br />Phone: (zoo) 4ae-sazo <br />Fax: (209) 464,0136 <br />June 18, 2012 <br />Kim White <br />Elite IV Contractors Inc. <br />2535 Wigwam Dr. <br />Stockton, CA 95205 <br />Re: Super Center Matt SR0065132 <br />701 E Charter Way, Stockton <br />The San Joaquin County Environmental Health Department (EHD) has completed this review of <br />the application for a permit to replace the direct bury 87 spial container an the underground <br />storage tank (UST) system at the above noted address. The permit has been approved with the <br />following conditions: <br />1. Contact the local fi-e department and the San Joaquin Valley Air Pollution Control <br />District for any applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to LHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />3. Contact Stacy Rivera at (209) 468-3440 to arrange the following inspection <br />T <br />(a 48-hour notice Is required for inspection appointments). <br />a. Cverh7l prevention verification: Measurement of drop tubes to verify 95% hank volume <br />shut off (d necessary). <br />b. Cnnos!on protection: Verify corrosion protection for d-ct bury spill bucket prior to <br />backfilling. <br />C. Spill bucket test: Verify minimum 5 -gallon capacity and pass a one hour hydrostatic <br />test (or equivalent). Proper drainage must also be verified. <br />d. Secondary containment testing on 87 UST (see condition #4). <br />Please he aware that the facility cannot receive fuel in the 87 grade tank prior to <br />the EHD inspection and approval. <br />4. Since concrete ulil be broken near the diesel UST, a secondary containment test must <br />be performed on the diesel UST once concrete is poured in accordance with the <br />manufacturer's guidelines. <br />