Laserfiche WebLink
hM:KFH Io:FW: Can you please Fax (1Z09w',14n) <br />19:11 10/0b/lb Ll N9 12 -It <br />Prevention + i dor AIR <br />ECEI VEL, <br />_. P.O. Box 1289...... Waterford, CA 95386 Telephone: -(209) 969-0851 <br />Email: ypccorp cnthotmail.com <br />Website: www.spcnl.an.com OCT 05 2015 <br />Certified Assessment Form (U.) for AST Systems <br />Assessor: Spill Prevention Compliance Corporation Onsite Assessor: Todd McWhorter [ENVIRONMENTAL. <br />P.O. Box 1289 Telephone: 209( ) 969-0851 '��A'T4'1�o4RT�A�PJT <br />Waterford, CA 95386 email: spccorp*_hotmail.com <br />Client: Stockton Hyundai Contact Person: Andy McCue, Service Manager <br />Address: 2979 Auto Center Cir. 2nd Contact: <br />City/State/Zip: Stockton, CA 95212 Date of Test: 9-22-15 <br />Assessment Data- Waste Coolant AST -a <br />1. AST Configuration & age of AST Horizontal AST Sinjjle eyall steel / approx. 15 vrs. old ( estimate ) <br />1 a. Useful Life Remaining of AST Approximately 15 veays of remaining life (Subsection kJ -k10) <br />2. AST Primary vessel construction (describe) 330 gals/Waste OiFUL4 402907 /UL142--Container/ Made to UL <br />142 construction standard -at least .123in. steel thickness per UL Std.- <br />3. <br />td:3. AST piping (describe) 1 in. galvanized and painted piping from Craco Husky 1040 Pump to 2 in opening <br />w/fitting, from pump for supply to top of AST. <br />4. Internal/External pump description external Craco Husky 1040 pump w/2 solenoid 12volt-10-200psi-- <br />External pump, which pumps waste oil from service ai gigs sec is <br />S. AST drawing (provided/dravvn: souree.L_see attached) <br />6. Design Standard (ASME, UL, etc.) UL 142 -Cylindrical Single bi all Steel /Mfr: ACE Tank <br />7. AST foundation (describe) concrete berm sub -floor Base of AST under l; L 142 adequate to withstand the <br />load of a full tank -Tank is anchored to floor <br />8. ASTanchoring (seismic zone/floatation risk) AST is anchored to the floor slab with 3/8 in. diameter <br />expansion anchors into the concrete berm floor. Stockton is in a (ground -shaking) seismic region, but the AST <br />is unlikely to move outside the room in an event, nor pose a risk of flotation in such an event. The AST is <br />situated in secured lubricants room. <br />9. AST will withstand frost -heave XX Yes No AST sits in concrete cinder block berm <br />10. AST previously relocated? _ Yc�!; XX No <br />11. AST Corrosion Protection Tank is complletel.ccovered in paint without evidence off cora osiop. Tank has <br />no specific corrosion protection beyond the paint. No pat i of the AST touches the ground. The base of the <br />AST is steel, raising the AST 1 inch above the floor. There is no evidence of corrosion taking place, however <br />there is debris beneath AST which should be removed. Tank's construction material is carbon steel. <br />12. AST Spill Prevention Equipment AST has product is placed into AST via pumping from external Graco <br />Busk Pugin . Product enerally not handled outside of its intended containers. Product removal occurs via <br />pumping out thru a 2 plue2ed o enin ion to of AST <br />13. Overfill Protection: AST sits in concrete berth with a Sentry product level alarm in the bernt. This alarm <br />was tested and found to be o gratin . The sound was minimal and indicative that the batteries in the Alarm <br />should be changed. AST has Krueger levet gan2e to indicate product levels in AST. <br />