Laserfiche WebLink
Page 6 of 13 <br /> F. SETTING: Set tanks on prepared bed with a slope downward toward the fill end of the <br /> tank. A slope of 3" difference between the two extreme openings of the tank is <br /> desired. The acceptable range of slope is 4" maximum and 2" minimum with the fill <br /> end lower than remote pump end of the tank. Tanks that exceed the acceptable slope <br /> or that slope downward to the remote pump end are improperly set and must be reset. <br /> G. INSTALLATION WITH APPROVED MATERIALS: Place a 12" lift of backfill evenly around the <br /> tanks. Push backfill completely underneath the tank and under the end caps. This is <br /> the most important part of the backfill process. Procedure can be done from bank or <br /> adjacent tank top. If a man will be in the hole to "work" the backfill, hole must be <br /> shored or side sloped as prescribed by current OSHA regulations. <br /> 1. Place second 12" lift or backfill evenly around the tanks. Again, repeat the <br /> "working" of backfill along sides under the end caps. Add backfill evenly <br /> around the tanks up to the tops of the tanks. <br /> 2. Backfill to subgrade after piping and testing is completed. <br /> 6-150.09 TESTING OF TANKS <br /> (Notify Owner's Representative, who MUST observe all tests, at least 24 hours in advance <br /> of any tests.) <br /> A. The Contractor is responsible for all labor, material and equipment necessary to <br /> conduct the following tests: <br /> Pre-Installation Pressure Test, Aix <br /> After-Installation Pressure Test, Aix or Hydrostatic <br /> Internal Measurements <br /> 1. ACCEPTABLE "SOAPS": "Soaping" the tank and fittings during the test is to be <br /> done using a small garden-type hand-pressurized spray unit. The test soap shall <br /> be a high foaming "soap" that bubbles easily if in contact with an air leak in <br /> the tank, but won't bubble due to dispensing from the pressure applicator. <br /> Acceptable soaps are: <br /> "Seam Test Concentrate" <br /> "Amway Lcc High Soap" <br /> "#7006 Southbed Leak Detector" <br /> B. PRE-INSTAL AmrON PRESSURE TEST, AIR: <br /> 1. PRIMARY (INNER) TANK TEST: Tighten all tank fittings. Locate a pressure gauge <br /> in the vent/monitor fitting in the secondary (outer) tank. Locate a second <br /> pressure gauge at a fitting in the manway and connect the air pressure hose to <br /> this same fitting. Pressurize the primary (inner) tank to a minimum 4 psi, <br /> maximum 5 psi. Monitor the pressure gauges a minimum of 1/2 hour. <br /> 2. SECONDARY (OUTER) TANK TEST: Leave the pressure on the primary tank. Using a <br /> flexible air hose manifold, connect the air pressure hose from the primary tank <br /> to the secondary tank. This manifold hose should be connected to the <br /> vent/monitor fitting that does not contain the air pressure gauge. Close the <br /> valve to the primary tank and disconnect the air supply. Pressurize the <br /> secondary tank by opening the valve in the manifold system. Soap the entire <br /> tank and all fittings. <br />