Laserfiche WebLink
6-150.07 UNDJND TANKS Page 5 of 13 <br /> A. MATERIALS: STI-P3 Steel storage tanks as supplied by the Owner are to be installed <br /> by Contractor in accordance with the plans and specifications and manufacturer's <br /> instructions. <br /> B. NEW TANK INSTALLATION, TANK RUUVAL, AND RM TRANSFER COORDINATION: The Contract <br /> shall coordinate and perform the work as follows: <br /> 1) 2,000 gallon diesel, 230 West Elm Street - New tank; no removal or fuel <br /> transfer; <br /> 2) 12,000 gallon unleaded, 230 West Elm Street - Install new tank; transfer fuel <br /> from existing 18,000 gallon tank; abandon 18,000 gallon tank; <br /> 3) 5,000 gallon diesel, 1331 South Ham Lane - Removal fuel (tank will be used such <br /> that remaining fuel is less than 500 gallons; remove tank; install new 5,000 <br /> gallon tank; <br /> 4) 2,000 gallon regular, 1331 South Ham Lane - New tank, no removal or fuel <br /> transfer; <br /> 5) 10,000 gallon unleaded, 1331 South Ham Lane - Removal fuel (tank will be used <br /> such that remaining fuel is less than 1,000 gallons; remove tank; install new <br /> 10,000 gallon tank; <br /> 6) 2,000 gallon waste oil, 1331 South Ham Lane - Install new tank; transfer waste <br /> oil from existing 500 gallon tank; abandon 500 gallon tank. <br /> 6-150.08 HANDLING OF TANKS <br /> A. LIFTING & MOVING: When lifting or moving tank, always use properly sized equipment <br /> and lift by lifting lug(s) . On large tanks, greater than 8' diameter, use a spreader <br /> bar to ensure a lift angle of at least 45 degrees at each lifting lug. <br /> B. HANLDING: The Contractor is responsible for off-loading the tanks from the delivery <br /> vehicle. A crane (or backhoe) of sufficient lifting capacity must be used. The <br /> weight of the 12,000 gallon double wall steel tank is approximately 23,400 lbs. <br /> 1. Never roll or use cables or chains around tank. Set on smooth ground, free of <br /> rocks and foreign objects. Exception: Tank can be rolled up to 90 degrees on a <br /> smooth clean surface when performing the "pre-installation" pressure test. <br /> C. CHOCKING: Tanks are to be chocked in accordance with manufacturer's reco7mnendation <br /> until ready for installation. If windy conditions exist or are expected, anchor <br /> tanks using minimum 1/2" nylon or hemp rope over each tank and secure to stakes of <br /> adequate size to prevent movement of the tanks. <br /> D. OPENINGS: All tanks are shipped with dust covers in each opening. Dust covers are to <br /> remain in each opening until ready for the pre-installation pressure test. Replace <br /> dust covers after this test has been completed. <br /> E. DAMAGE: If tank is damaged, do not attempt repairs. Owner's Representative is to be <br /> notified and will determine the course of action that will be followed. <br />