My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
INSTALL 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 4:03:04 PM
Creation date
12/4/2018 10:49:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1988
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
标签
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 9 of 13 <br />C. BONDING AND ACHSIVFS SYSTF3 (Fiberglass pipe) : (CONTINUED) <br />3. Inspect all fittings for for roP <br />joints. p te' gnment and possible "back -out" at the <br />4. Follow pipe manufacturer's relations on cure time before disturbing joints <br />or testing. In areas of temperature below 60 degrees F16 <br />be necessary to apply heat for curing adhesive. ( degsec it will <br />Only ch <br />devices re=mw-nded by pipe manufacturer area emical or electrical <br />open flame or acceptable for this purpose. No <br />sparkling devices are to be used. <br />1. Threaded joints must be reamed and have clean cut, perfect threads and be made <br />up with non -hardening joint cwPOUnd insoluble in <br />Company Representative. petroleum products approved by <br />2. Approved joint : <br />Rectorseal <br />Gilbarao pipe Joint <br />Permatex 57 <br />E. FIBERGLASS TO SI'F'Fr' PIPE TIONS: Fiberglass madded- nd adapters <br />d �re are to be <br />threaded into the steel pipe or fitting before <br />bonding ontoiberglass pipe. <br />F. SWING JOIN'T'S: Use steel pipe and fittings: two 90 degree elbows with nipple <br />connection (do not use close nipple or street ell) at vent risers only. <br />G. FI=BLE CONNECTORS: Use flexible connectors for connection of product and vapor <br />return piping at tanks and dispensers, and for vent piping at tanks. <br />. SPECIAL, FITTINGS: <br />1. The shut-off valve ("Shear" or "Safety" valve) at the base of the product pump <br />or dispenser is to be secured in position with a steel stabilizer as detailed on <br />the drawings. <br />2. Position the valve so that the line test port plug is accessible. <br />PIPE WRAPPING: All underground steel pipe and fitth-,gs shall be field primed and <br />wrapped. Wrapping material shall be 35 mil polyethylene tape "polyken 930" <br />manufacturered by the Kendall Company (or equal approved by Ccepany Representative). <br />Wrap overlap shall be one-half width of wrapping material. Wrap 1-1/2" and 211 <br />fittings with POlyken 900 (12 mils) with a 60% overlap. in difficult areas Polyken <br />931 can be used before wrapping with Polyken 900. Primer shall be Polyken 927. <br />J. SETTING AND BEDDING PIPE: <br />1. A 4" minimum bed of backfill material is to be placed in all piping <br />trenches. Smooth, ccupact and slope bedding material to allow a slope of 1/4" <br />per foot toward the tanks. In extreme conditions, 1/8" per foot may be used if <br />approved by Owner's Representative, refer to other portions of these <br />specifications. <br />2. Piping shall be placed on prepared bed in such a manner as to minimize points at <br />which one pipe may cross over another pipe. At points where piping must cross <br />over, a minimum of one pipe diameter must separate the pipes. <br />6.20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.