My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
INSTALL 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 4:03:04 PM
Creation date
12/4/2018 10:49:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1988
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 10 of 13 <br />3. When piping is placed on the bed, proceed to "First Test" (below) prior to <br />backfilling trenches. <br />6-150.12 TESTING OF PIPING <br />A. Notify the Owner's Representative, who MUST observe all tests, at least 24 hours in <br />advance of any tests. <br />B. The Contractor 'is responsible for all labor, material, and equipment to conduct <br />pressure tests (air or hyrdostatic) of all product, vent and vapor recovery piping. <br />C. FIRST TEST (Prior To Backfilling Pipe Trenches): Do not connect piping to tanks, <br />remote pumps or dispensers. <br />1. The entire piping system, i.e., product, vent and vapor recovery (where <br />applicable), shall be tested in accordance with the following three step <br />procedure. <br />2. <br />a. <br />b. <br />Step One: Install pressure application system that includes two pressure <br />gauges (15 psig maxim m). Apply 10 prig pressure to each piping system. <br />Soap all joints using approved soap solution. Carefully observe each joi <br />for evidence of leaks. <br />Step Two: Protect area around piping systems to be tested to prevent <br />workmen, passers-by, etc., from entry. Install pressure application sy <br />that includes two pressure gauges (150 psig maximzn). Apply 60-75 psig <br />pressure to each piping system, hold for 30 minutes, release pressure. <br />C. CAUITON: Be sure to disconnect at tank or suhmerged pump before applying <br />arm. <br />d. <br />.7•• � �. :1.11 • •1 «� • � . • • � ... II.?. •.. / • ;• � <br />17� <br />•• ••• •• til:+mulzin <br />e. <br />Step Three: Protect area ara-4 piping systems to be tested to prevent <br />workmen, passers-by, etc., from entry. Install pressure application system <br />that includes two pressure gauges (10 psig maximum). Apply 5 psig pressure <br />to each piping system, hold for 30 minutes, release pressure. <br />CONTRACIOR SHATL AFdW1GE AND PAY FOR THE PERFORMANCE OF A S= CE= = <br />PRECISION TEST (PFrRO-=, HUNTER OR NDE TECH.) OF 111E =IRE SYSTEM PRIOR <br />COVERING TAI AND P!RO;XJCT PIPING. TEST S11AM BE CONDUCTED USING WMETI OR <br />PRODUCT. NOTIFY01 HOURS IN ADVANCE OF E1 CanRACTOR Is READy• - <br />a. <br />6-151 ELE=CAL WORK <br />6.21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.