My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
INSTALL 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 4:03:04 PM
Creation date
12/4/2018 10:49:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1988
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ ROBERT H. LEE & ASSOCIATES, INC. <br /> ARCHITECTURE PLANNING ENGINEERING <br /> 1337 HOWE AVENUE,#211,SACRAMENTO,CALIFORNIA 95625 •(916)646-4003 <br /> October 29 , 1987 , <br /> SM/1HTVIRA183A <br /> Mr. Dan Moe H-LIV]3H 1d1N3AMMN3 <br /> San Joaquin Local Health District <br /> 1601 E. Hazelton Avenue L861 2 A 0 N <br /> P.O. Box 2009 <br /> Stockton, CA 95201 <br /> CITY OF LODI M. S . C. <br /> 1331 SOUTH HAM ROAD <br /> LODI, CALIFORNIA 95241 <br /> Dear Mr. Moe: <br /> This letter is in response to your questions regarding the new <br /> tank installation for the above referenced facility. <br /> 1. Name of tank manufacturer: N.J. McC utchen, 1231 West <br /> Sonora, Stockton, CA - Phone: (209) 466-9704 <br /> 2 . Specifications for installation of tanks and piping: See <br /> attached drawings Sheet A-5 . <br /> 3 . Type of piping: A.O. Smith Red Thread II Primary and <br /> Secondary. <br /> 4 . Piping and tank monitor: Leak-A-Lert, see attached <br /> referenced material . <br /> 5 . Installation of overfill/spill for waste oil tank: 36" <br /> dia. fiberglass containment box, see Sheet A-3 . <br /> 6 . Monitoring of double wall piping: This will be achieved <br /> by the leak alert sensors located in each of the <br /> fiberglass containment boxes surroundig the sub-pump and <br /> waste oil pump out riser. The piping secondary contain- <br /> ment will drain into this low point of the product <br /> piping. <br /> 7 . Maintenance and check system on the sacraficial anodes: <br /> The anodes will be tested every year by taking structure <br /> to soil voltage readings per Steel Tank Institute (STI) <br /> specifications . <br /> 8 . Piping cross section: See Detail ' E ' , Sheet A-4 . <br /> BRANCHES:LARKSPUR,CA(415)461-8890 PETALUMA.CA(707)765-1660 <br />
The URL can be used to link to this page
Your browser does not support the video tag.