Laserfiche WebLink
Page two <br /> October 29 , 1987 <br /> Mr. Dan Moe <br /> 9 . Monitoring Plan, Spill Plan, Emergency Response Plan, <br /> Overfill/Spill Plan: See attached Hazardous Materials <br /> Management Plan. <br /> 10 . Removal of product from annular space: will be done by a <br /> qualified petroleum contractor with an approved hand <br /> pump. All removed liquid will be returned to the <br /> refinery for processing. <br /> 11. Inspection during delivery: Omer Coulter, the M.S . C. <br /> maintenance supervisor, will be responsible for <br /> supervising the delivery of gasoline to the site, and <br /> when the waste oil is removed from the waste oil tank. <br /> If you have any further questions, or are in need of any <br /> additional information, please contact our office. Thank you <br /> for your time and cooperation in processing this application. <br /> Very truly yours, <br /> ROBERT H. LEE AND ASSOCIATES, INC. <br /> IB111 <br /> PheR. Wilson <br /> Branch Manager <br /> BRW/cg <br /> cc: Mr. Dick Weich, City of Lodi <br /> ROBERT H. LEE S ASSOCIATES <br />