My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
INSTALL 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 4:03:04 PM
Creation date
12/4/2018 10:49:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1988
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MISC#4\FILES\9750SPEC Page 6 of 22 <br /> b. The minimum depth of cover for FRP tanks is 410" and <br /> the maximum is 710" (not to be exceeded) . <br /> C. Product lines shall be sloped 1/4" per ft. to pump <br /> islands . Minimum slope is 1/8" per ft. <br /> d. Vent and vapor return lines shall be pitched 1/4" per <br /> ft. Minimum slope is 1/8" per ft. <br /> e. 1/2" pipe diameter separation at cross-overs. <br /> f. The Contractor is responsible for any design, <br /> materials, equipment, permits, etc. , for shoring or <br /> side sloping a hole. <br /> 1. 3 FILL AND BACKFILL <br /> A. All fill material shall be of a granular nature, free from <br /> vegetation and extraneous material. Company Rep. shall <br /> inspect and approve the material before it is spread. Spread <br /> material in lifts not to exceed 12 inches and tamp thoroughly. <br /> When required by local code, General Contractor shall provide <br /> a compaction test for certification of fill. <br /> B. APPROVED BACKFILL MATERIALS: <br /> 1. PEA GRAVEL. A clean, naturally rounded aggregate with a <br /> 1/8" minimum and a 3/4" maximum diameter. Up to 3% of <br /> the particles may pass through a #8 sieve. <br /> 2 . STONE OR GRAVEL CRUSHINGS. Washed material, with <br /> particle size between 1/8" and 1/2" . Up to 3% of the <br /> particles may pass through a #8 sieve. <br /> 3 . Approved materials must be dry, free of ice and snow, and <br /> meet ASTM C-33 , Para. 9. 1 for quality and soundness. <br /> VERIFY THAT BACKFILL MATERIAL IS IN ACCORDANCE WITH TANK <br /> MANUFACTURER'S SPECIFICATIONS. <br /> C. ALTERNATE BACKFILL MATERIALS (Defined as any material not <br /> meeting above requirements for approved materials) : <br /> 1. Approval of Company Rep. is required prior to use of such <br /> material. In certain instances, the approval of the tank <br /> manufacturer may be required to preserve the tank <br /> warranty. Company shall obtain such approval, <br /> 2 . Alternate material, if used, must be dry and free of ice <br /> and snow. The tank hole sides must be shored or side <br /> sloped to permit entry for compaction and testing. <br /> 1. 4 BEDDING OF TANKS <br /> A. A 12" minimum bed of backfill material is to be placed in the <br /> hole, smoothed and sloped to allow a tank slope of 1" in 10' <br /> downward toward the fill end prior to setting the tank. <br />
The URL can be used to link to this page
Your browser does not support the video tag.