My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
INSTALL 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 4:03:04 PM
Creation date
12/4/2018 10:49:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1988
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 'MISC#4\FILES\9750SPEC Page 7 of 22 <br /> 1. When specified, the down "logs" shall be installed prior <br /> to be bed material. Caution - Do not place FRP tanks on <br /> concrete slabs, timbers, beams, cradles or grout the <br /> tanks in wet cement. The tank, whether tied down or not, <br /> must never be left on the bed without a backfill to the <br /> top of the tank if there is any chance of water, 12" or <br /> more above the tank bottom, in the hole. <br /> 1. 5 OBSERVATION WELLS <br /> A. If shown on drawings, two slotted observation wells in <br /> opposite corners of the tank hole, are to be installed: Sample <br /> wells are to be positioned in the hole prior to placing the <br /> bedding material and supported to remain vertical during <br /> backfill. Bottom of observation well is to be 12" minimum <br /> below the bottom of tanks. Top of pipe to terminate in 12" <br /> diameter fillbox. Slotted observation wells shall be provided <br /> byh General Contractor, unless otherwise instructed by Company <br /> Rep. <br /> 1. 6 TANK HOLE LINER <br /> A. Contractor is to provide a Filter Fabric Tank Hole Liner when: <br /> 1. Tank hole is unstable soil , as defined above, or <br /> 2 . Specified by Company Rep. The entire tank hole (sides <br /> and bottom) shall be covered. Lay the fabric with 2 foot <br /> minimum overlaps. <br /> 3 . Bedding material, tie-down "logs" and sample wells are to <br /> be placed on the top of the filter fabric. Excess fabric <br /> at the top of the hole should be folded over the backfill <br /> material at subgrade level . <br /> B. APPROVED FILTER FABRIC MATERIAL: <br /> Dupont "Typar" Spunbound Polypropylene - Style 3401 <br /> Phillips Fibers Corp. - "Supac" Fabric <br /> Monsanto - "Bidim" C22 <br /> or approved equals <br /> 1. 7 BALLAST <br /> A. Water is to be used as ballast under all conditions where <br /> ballast is required. <br /> 1. DRY HOLE CONDITION: Tanks, with backfill to top of tanks, <br /> must be ballasted if there is any chance that surface of <br /> subsurface water will enter the tank hole to a depth of <br /> 23" or greater above the bottom of the tanks. Caution - <br /> Do not ballast tanks until backfill is to top of tanks. <br />
The URL can be used to link to this page
Your browser does not support the video tag.