My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
INSTALL 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 4:03:04 PM
Creation date
12/4/2018 10:49:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1988
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'MISC#4\FILES\9750SPEC Page 9 of 22 <br /> E. DAMAGE: If tank is damaged, do not attempt repairs. Company <br /> Rep. is to be notified and will determine the course of action <br /> that will be followed. <br /> F. SETTING: Set tanks on prepared bed with a slope downward <br /> toward the fill end of the tank. A slope of 3" difference <br /> between the two extreme openings of the tank is desired. The <br /> acceptable range of slope is 4" maximum and 2" minimum with <br /> the fill end lower than remote pump end of the tank. Tanks <br /> that exceed the acceptable slope or that slope downward to the <br /> remote pump end are improperly set and must be reset. <br /> G. INSTALLATION WITH APPROVED MATERIALS: Place a 12" lift of <br /> backfill evenly around the tanks. Push backfill completely <br /> underneath the tank between the ribs and under the end caps. <br /> This is the most important part of the backfill process. <br /> Procedure can be done from bank or adjacent tank top. If a <br /> man will be in the hole to "work" the backfill, hole must be <br /> shored or side sloped as prescribed by current OSHA <br /> regulations. <br /> 1. Place second 12" lift or backfill evenly around the <br /> tanks. Again, repeat the "working" or backfill between <br /> the ribs and under the end caps. Add backfill evenly <br /> around the tanks up to the tops of the tanks. <br /> 2 . Backfill to subgrade after piping and testing is <br /> completed. <br /> H. INSTALLATION WITH ALTERNATE MATERIALS: All alternate materials <br /> must be compacted to 90% relative density (ASTM D-1557-70) . <br /> Contractor is to furnish with certification of compaction from <br /> a registered soil engineer. <br /> 1. Company Rep. is responsible for providing the exact <br /> installation specificattio-nn for alternate materials. <br /> 2 . 3 TESTING OF TANKS <br /> (Notify the Company Rep. , who MUST observe all tests, at least <br /> 24 hours in advance of any tests. ) <br /> A. The Contractor is responsible for all labor, material and <br /> equipment necessary to conduct the following tests: <br /> Pre-Installation Pressure Test, Air <br /> After-Installation Pressure Test, Air or Hyrdostatic <br /> Internal Measurements <br />
The URL can be used to link to this page
Your browser does not support the video tag.