Laserfiche WebLink
MISC\TANKS . PEC <br /> Page 10 of 22 <br /> 1. ACCEPTABLE "SOAPS" : "Soaping" the tank and fittings during <br /> the test is to be done using a small garden-type hand- <br /> pressurized spray unit. The test soap shall be a high <br /> foaming "soap" that bubbles easily if in contact with an <br /> air leak in the tank but won't bubble due to dispensing <br /> from the pressure applicator. Acceptable soaps are: <br /> "Seam Test Concentrate" <br /> "Amway Loc High Soap" <br /> "#7006 Southbend Leak Detector" <br /> or approved equals <br /> 2 . 4 DOUBLE WALL TANK INSTALLATION <br /> A. HANDLING: The Contractor is responsible for off-loading the <br /> tanks from the delivery vehicle. A crane or backhoe of <br /> sufficient lifting capacity must be used. The weight of the <br /> double wall FRP tank is approximately 5000-6000 lbs. <br /> B. PRE-INSTALLATION PRESSURE TEST, AIR: <br /> 1. PRIMARY (INNER) TANK TEST: Tighten all tank fittings. <br /> Locate a pressure gauge in the vent/monitor fitting in the <br /> secondary (outer) tank. Locate a second pressure gauge at <br /> a fitting in the manyway and connect the air pressure hose <br /> to this same fitting. Pressurize the primary (inner) tank <br /> to a minimum 4 psi, maximum 5 psi. Monitor the pressure <br /> gauges a minimum of 1/2 hour. <br /> 2 . SECONDARY (OUTER) TANK TEST: Leave the pressure on the <br /> primary tank. Using a flexible air hose manifold, connect <br /> the air pressure hose from the primary tank to the <br /> secondary tank. This manifold hose should be connected to <br /> the vent/monitor fitting that does not contain the air <br /> pressure gauge. Close the valve to the primary tank and <br /> disconnect the air supply. Pressurize the secondary tank <br /> by opening the valve in the manifold system. Soap the <br /> entire tank and all fittings. <br /> C. POST-INSTALLATION PRESSURE TEST, AIR: Procedures for the pre- <br /> installation pressure test shall be repeated. This test may be <br /> performed with or without piping and fittings attached. The <br /> secondary (outer-) tank test must be performed a minimum of 1/2 <br /> hour and all fittings shall be soaped. <br /> D. BALLASTING: Only the primary (inner) tank shall be used when <br /> ballasting the tank. Never fill the secondary (outer) tank with <br /> a fluid. <br /> E. PRIMING: Manway lids shall be primed with Polyken 927 . <br /> F. BURIAL DEPTH: The burial depth from the top of the tank to <br /> ground level shall be a minimum of 4 feet and a maximum of 7 <br /> feet. The fittings in the manyway are approximately 5-6 inches <br /> off the top of the tank. This shall be considered for the slope <br /> of the piping and thus may affect the tank burial depth. <br />