My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
INSTALL 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 4:03:04 PM
Creation date
12/4/2018 10:49:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1988
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MISC#4\FILES\9750SPEC Page 12 of 22 <br /> 3 . Insert each cable through its own anchor loop in the <br /> "log" reserving sufficient cable so that both ends of the <br /> cable will be kept at the top of the tank hole after the <br /> "logs" are set. Lower and position the "logs" in the <br /> tank hole keeping both ends of the cables at the top of <br /> the hole. Install the 12" minimum thick bedding material <br /> in tank hole. Smooth and slope per the tank bedding <br /> instructions. <br /> 4 . Proceed with setting the tanks by adding ballast as <br /> necessary to sink and keep down the tanks. Use only <br /> enough ballast to hold the tanks down until the backfill <br /> is even with the top of the tanks. (Refer to tank <br /> setting requirements. ) Caution: Ballast level in tank <br /> must never exceed water (or backfill) level in tank hole <br /> during installation. <br /> 5. Install the cable guards, guides, etc. , furnished by the <br /> tank manufacturer on the designated ribs of the tank. <br /> (Note: "Designated Ribs" are marked by arrows on the <br /> tank surface. ) Caution: Do not place straps or cables <br /> bewteen the ribs of the tank. <br /> 6. Pass each set of cables (a set of cables are those <br /> passing throught the matching, or opposite, loops on the <br /> "logs") through the guides and loops as shown on the <br /> drawing. <br /> a. One end of each cable is to be crossed over the top <br /> of the tank in the retainer portion of the hold-down <br /> strap. Using three cable clamps on each set of <br /> cables, clamp both cables together on top of the <br /> tank. Prior to tightening the clamps, tension the <br /> cables with "come-a-longs" secured outside the tank <br /> hole. Use enough tension to tighten the cables but <br /> not to lift the "logs" or crush the tank. Caution: <br /> All sets of cables on a tank must be tightened <br /> equally to avoid tank deformation. <br /> b. The cable must rest on the top of the hold-down strap <br /> between the guides provided. Repeat this process for <br /> each set of tie-down cables. <br /> 7 . After all tie-downs are completed, commence the backfill <br /> procedures tq the top of the tanks. <br /> 3 . 1 PRODUCT, VENT AND VAPOR RECOVERY PIPING <br /> A. All piping, fittings, risers, wrapping materials, etc. , shall <br /> be furnished and installed by the Contractor. Specific <br /> materials noted in this specification and/or on plans will be <br /> furnished by Owner, hereinafter referred to as Company. <br /> 1. All pipe runs are to be of "fiberglass" pipe and sized in <br /> accordance with plans. <br />
The URL can be used to link to this page
Your browser does not support the video tag.