My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
INSTALL 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 4:03:04 PM
Creation date
12/4/2018 10:49:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1988
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MISC\TANKS. PEC <br /> Page 11 of 22 <br /> G. MONITORING: <br /> 1. Monitoring of the annular space is to be performed by an <br /> electronic system. A 1 inch conduit shall be run in series <br /> from each monitoring riser top the main electrical panel . <br /> 2 . General Contractor shall install and test tank sacraficial <br /> anodes per manufacturer' s instructions and <br /> recommendations. <br /> 2 . 5 TANK HOLD-DOWN INSTALLATION (IF REQUIRED) <br /> A. GENERAL REQUIREMENTS : Underground storage tanks must be <br /> anchored with concrete hold-downs ("logs" or "deadmen") when <br /> specified by Company Rep. <br /> 1. Tank bedding, ballasting and tank hole backfill procedure <br /> are described elsewhere in these specifications. <br /> 2 . The tank anchorage system shown on the drawings is designed <br /> for a maximum level of ground water equal to the subgrade <br /> level . <br /> B. MATERIALS: <br /> 1. CONCRETE HOLD-DOWNS : Precast, reinforced concrete "logs: , <br /> 12" x 12" or 12" x 24" in cross-section, with chamfered <br /> edges. Length, as shown on the drawings. 1/2" diameter <br /> galvanized steel anchor loops are to be cast into "logs" at <br /> locations shown. Precast material shall achieve its <br /> ultimate compressive strength of 2500 psi (28 days) prior <br /> to installation. Precast concrete foundation piles which <br /> meet or exceed above specifications are acceptable. <br /> 2 . WIRE ROPE CABLE: Hot-dip galvanized steel wire rope, <br /> minimum 1/2" diameter, breaking strength, 20 . 4K. <br /> 3 . HARDWARE: Cable clamps, cable guides, guards, etc. , <br /> furnished by the FRP tank manufacturer, shall be hot-dip <br /> galvanized steel . <br /> 4 . PROTECTIVE COATING: Prior to backfilling tanks, apply a <br /> generous quantity of asphalt coating by brush to all <br /> exposed steel cables, loops and hardware. <br /> C. INSTALLATION PROCEDURE: <br /> 1. Prepare the tank hole to receive the hold-down "logs" . <br /> Install shoring (or side sloping) in accordance with these <br /> specifications as noted elsewhere. <br /> 2 . Pump the water out of the tank hole. Keep water out of the <br /> tank hole until tanks have been set, tied down, ballasted <br /> and backfilled. <br />
The URL can be used to link to this page
Your browser does not support the video tag.