Laserfiche WebLink
UNDERGROUND TANK INSTALLATIONS <br />230 West Elm Street and SECTION 6 <br />1331 South Ham Lane SPECIAL PROVISIONS <br />6-01 DESCRIPTION OF WORK <br />The work consists of installing six City -furnished, double-wall, <br />steel tanks for storage and dispensing of gasoline and diesel <br />fuels and storage of waste oil. The work includes furnishing and <br />installing product, vent, and vapor recovery lines and connection <br />to existing dispensers; disposal of existing tanks; and other <br />incidental and related work, all as shown on the plans and <br />specifications for the project. <br />The work to be done is shown on the following plans: <br />VICINITY MAP <br />APPENDIX A, Sheet 1 - Additional Cathodic Protection Anode <br />Installation <br />Sheet 2 - Anode Detail <br />APPENDIX B - Work Area, 230 W. Elm Street <br />D44 - Underground Tank Installations, 230 W. Elm Street (separate) <br />D45 - Underground Tank Installations, 1331 S. Ham Lane (separate) <br />6-02 QUANTITIES <br />The preliminary estimate of the quantities of work to be done and <br />materials to be furnished as shown in the proposal are approximate <br />only, being given as a basis for the comparison of bids. The City <br />of Lodi does not expressly or by implication agree that the actual <br />amount of work will correspond therewith, but reserves the right <br />to increase or decrease the amount of any class or portion of the <br />work or to omit portions of the work that may be deemed necessary <br />or expedient by the City Engineer. <br />Additions or deletions in the quantity of work as set forth in <br />these specifications and accompanying drawings for lump sum items <br />may be ordered by the Engineer after the contract price has been <br />adjusted accordingly to the satisfaction of both the Contractor <br />and the City of Lodi, and they have been accepted in writing by <br />the Engineer. <br />6-03 MATERIALS <br />The Contractor shall furnish for use under these Special <br />Provisions all materials required to complete the project, except <br />those materials specifically shown on the Plans or listed in these <br />Special Provisions as "City furnished". <br />6.1 <br />TAt,IVC /TVTM (1'JM <br />