My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
INSTALL 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 4:03:04 PM
Creation date
12/4/2018 10:49:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1988
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Whenever any material is specified by name and/or number thereof, <br />such reference shall be deemed to be used for the purpose of <br />facilitating a description of the materials and establishing <br />quality, and shall be deemed and construed to be followed by the <br />words, "or approved equal". No substitution will be permitted <br />which has not been submitted ten days prior to installation for <br />approval by the Engineer. Sufficient descriptive literature <br />and/or samples must be furnished for any materials submitted as <br />"equal" substitutes. <br />The City will furnish the following materials: <br />° Double -Wall StiP3 Tanks as shown on the plans; <br />° "Leak Alert" electronic control enclosure with remote sensors. <br />The Contractor shall make arrangements with the tank manufacturers <br />for delivery of the tanks. <br />6-04 SCHEDULING PROJECT WORK <br />6-04.01 Scheduling Work Prior to any work, the Contractor <br />shall furnish the Engineer with a work progress schedule in <br />writing delineating the anticipated work procedure. This schedule <br />shall be kept current and the Engineer shall be notified in <br />writing 48 hours in advance of any variation thereof. The <br />Contractor shall also supply the Engineer with a telephone number <br />or numbers where a duly authorized representative of the <br />Contractor may be reached at any time. <br />Prior to construction, a conference with the Contractor and <br />Engineer concerning the schedule, traffic control and job safety <br />shall be held. <br />The Contractor shall take the following time constraints into <br />account in preparing the project schedule: <br />1) Dispensers at 1331 South Ham Lane and 230 West Elm Street <br />shall not be out of operation at the same time; <br />2) The new unleaded tank at 230 West Elm Street shall be <br />installed prior to shut -down of the dispenser. The switchover <br />to the new tank shall be done such that the dispenser <br />shut -down is limited to two calendar days. <br />3) The new fuel tanks at 1331 South Ham Lane shall be installed <br />such that the dispenser shut -downs are limited to 35 <br />calendar days. <br />4) Due to other scheduled work at 230 West Elm Street, tank <br />installation at that location shall not start until after <br />July 25, 1988. <br />See Section 6-04.03 of these Special Provisions regarding <br />liquidated damages and these time constraints. <br />6.2 <br />TANK6/TXTW.02M <br />
The URL can be used to link to this page
Your browser does not support the video tag.