Laserfiche WebLink
i <br /> Jan'07-99 05s52P STRONG INC_ 7145571162 P.03 <br /> h <br /> a <br /> L- <br /> i <br /> Srilt m,j of site conditions: <br /> A. Potential source of contamination has been removed(the tank). <br /> B. Soil sampling at approximately-14' below grade is ND(TPHd, BTEX) for all three <br /> tank removal samples. i <br /> C. Ground water is estimated to be aver 5U'below grade. i <br /> D. Soil is composed of clays and silts, minimizing leaching potential. ' <br /> E. All surrounding areas are to be resurfaced with concrete and/or asphalt,minimising <br /> potential for storm water infiltr,tUon. <br /> We believe that based on the site conditions and low concentrations of soil contamination in <br /> the tank removal excavation,that nu rurther work should be required. Per your <br /> requirements, we will be completing the tank removal report within the.conting weeks and <br /> will forward this to your agency. <br /> We would lilac to further discus`the various items a%s()eijzted with the above conditions at <br /> your earliest convenience. <br /> Best Regar s, I <br /> Scott T. Strong <br /> Vice President <br /> Enclosure <br /> f <br /> i <br />