My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO 2006 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2019 4:07:20 PM
Creation date
12/5/2018 9:18:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2010
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK SYSTEM <br /> DESIGNATED UST OPERATOR MONTHLY INSPECTION REPORT <br /> Facility Name: City of Lodi Inspection Date: January 25, 2008 <br /> Facility Address: 1331 S. Ham Lane City: Lodi <br /> Name of Designated UST Operator Conducting Inspection: Dennis Callahan <br /> International Code Council Certification No.: 1004653-UC Expiration Date: 12/20/2008 <br /> Signature: Phone: (209) 333-6800 ext.2690 <br /> N/A=Not A plicable <br /> Item MONITORING PANEL/ALARM HISTORY Yes No N/A <br /> 1. Is the monitoring system powered on and in proper operating mode? ® ❑ Q <br /> 2. Is the monitoring system not currently showing any leak alarms? ® ❑ <br /> 3. Is the Alarm History Report/log for the previous month available,and has it been reviewed by the ® ❑ ❑ <br /> Designated UST Operator? (Attach a copy of the alarm history report/log to this inspection form.) _ <br /> 4. Has each alarm for the previous month been responded to appropriately? no kLA-PAJ ❑ ❑ <br /> UST SYSTEM INSPECTION <br /> 5. Are tank-top containment sumps free of water,debris,and hazardous substance? Note:/jtl7e answer to Item 41vas "Yes."skip <br /> lin Item 6. amps where an alarm has occurred nn the past 171017th nnrst he inspected rl a cpmlilied service teclnncum has not responded to, and <br /> 1 <br /> properly addressed,the cause o the alarm_Documentation veri wng appropricrie service should be attached to this report- <br /> Yes <br /> e rt.Yes No Yes No <br /> Sump Location: S/W Fuel Island E ❑ Sump Location: N/E Fuel Island ® ❑ <br /> f Sump Location: N/W Fuel Island ® ❑ Sump Location: S/E Shop <br /> 6. Are spill buckets(containment structures)free of water,debris,and hazardous substance? <br /> Yes No N/A Yes I No N/A <br /> Tank I ID- 10,000 Unleaded ® ❑ ❑ Tank 4 ID-Waste Oil ❑ ElZ <br /> Tank 2 ID- 2,000 Unleaded ® ❑ Tank 5 ID- El El <br /> Tank 3 ID- 5,000 Diesel M I ❑ I ❑ Tank 6 ID- <br /> 7. Are under-dispenser containment areas free of water,debris,and hazardous substance? <br /> Yes No N/A Yes No N/A <br /> u Dispenser- 1/2 Multi-product E ❑ ❑ Dispenser- ❑ ❑ ❑ <br /> 1 <br /> Dispenser- ❑ ❑ ❑ Dispenser- ❑ ❑ ❑ <br /> Dispenser- ❑ ❑ ❑ Dispenser- ❑ ❑ ❑ <br /> Dispenser- ❑ ❑ ❑ Dispenser- <br /> 8. <br /> ispenser-8. Leak detection is properly located within under-dispenser containment- <br /> Yes No I N/A Yes No N/A <br /> Dispenser- 1/2 Multi-product ® ❑ 1 ❑ Dispenser- Q ❑ ❑ <br /> Dispenser- ❑ ❑ ❑ Dis nser- ❑ ❑ ❑ <br /> Dispenser- Q ❑ ❑ Dispenser- ❑ ❑ ❑ <br /> Dispenser- ❑ ❑ ❑ Dispenser- ❑ ❑ ❑ <br /> PAPERWORK INSPECTION Yes I No N/A Date Done <br /> 9. Monitoring System Certification was completed within the past 12 months? ® I [—:IT-[] 9/27/2007 <br /> 10. Line Leak Detectors were tested/certified within the past 12 months? 9/27/2007 <br /> 11. Spill bucket(containment structure)testing completed within the past 12 months? ® ❑ ❑ 9/27/2007 <br /> 12. Line tightness testing completed within the required time frame? ® ❑ ❑ 2/13/2007 <br /> 13. Secondary containment tests completed within the required time frame? 10/5/2007 i e&Z� <br /> 14. Enhanced Leak Detection completed within the required time frame? ❑ I ❑ 10 t vs- <br /> 15. Other required testing/maintenance was completed within required time frame? (List tesdmaintenance items helow.) <br /> Describe Test/Maintenance: Drop Tube Integrity Test-every 3 yrs ® 1 ❑ ❑ 10/31/2005 <br /> 1 Describe TesUMaintenance: Static Torque& Rotation Test-every 3 yrs ® ❑ ❑ 10/31/2005 <br /> FACILITY EMPLOYEE TRAINING Yes No N/A <br /> 16. Have all facility employees received the required on-the-job training within the past year? ® ❑ ❑ <br /> 17. Have all facility employees hired within the past 30 days received the required on-the-job training.? <br /> Note: Explain any"No"answers in the"Comments" section on the following page. Those issues require corrective action from <br /> the UST owner/operator. <br /> UN-057-1/2 wim.unidocs.org 9/26/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.