Laserfiche WebLink
UNDERGROUND STORAGE TANK SYSTEM <br /> DESIGNATED UST OPERATOR MONTHLY INSPECTION REPORT <br /> Facility Name: City of Lodi Inspection Date: December 24, 2007 <br /> Facility Address: 1331 S_ Ham Lane City: Lodi <br /> Name of Designated UST Operator Conducting Inspection: Dennis Callahan <br /> International Code Council Certification No.: 1004653-UC Expiration Date: 12/20/2008 <br /> Signature: Phone: (209) 333-6800 ext. 2690 <br /> N/A=Not Applicable <br /> Item I MONITORING PANEL/ALARM HISTORY Yes No I N/A <br /> 1. Is the monitoring system powered on and in proper operating mode? ® El <br /> 2. Is the monitoringsystem not currently showing any leak alarms? ® ❑ ❑ <br /> r43. Is the Alarm History Report/log for the previous month available,and has it been reviewed by the ® ❑ ElDesignated UST Operator? (Attach a copy of the alarm history reporUlog to this inspection form.) <br /> . Has each alarm for the previous month been responded to appropriately? ® ❑ 1 ❑ <br /> r UST SYSTEM INSPECTION <br /> 5. Are tank-top containment sumps free of water,debris,and hazardous substance? Note_If the answer to/tent 4 was"Yes,"skip { <br /> to Item f,_ Sumps it an alarm has occurred in the rust month nmst he inspected it-it qualified semce tectuncicnt/las not responded to,and <br /> property addressed,the cause o the alarm.Documentation vert,•in g garopr7ale service should be attached to this report. <br /> Yes No Yes No <br /> j, Sump Location: S/W Fuel Island E ❑ Sump Location: N/E Fuel Island ® ❑ <br /> Sunip Location: N/W Fuel Island ® ❑ Sump Location: S/E Shop ® ❑ <br /> 6. Are spill buckets(containment structures)free of water,debris,and hazardous substance? <br /> Yes No N/A Yes No N/A <br /> Tank I ID— 10,000 Unleaded B-T El Tank 4]D—Waste Oil Li <br /> Tank 2 ID— 2,000 Unleaded ® ❑ ❑ Tank 5 ID— ❑ ❑ ❑ <br /> Tank 3 ID— 5,000 Diesel N I El ❑ Tank 6 ID— ❑ ❑ ❑ <br /> 7. Are under-dispenser containment areas free of water,debris,and hazardous substance? <br /> Yes No N/A I Yes No N/A <br /> Dispenser— 1/2 Multi-product ® ❑ [:J I Dispenser— ❑ ❑ <br /> El <br /> Dispenser— ❑ ❑ Dispenser— ❑ ❑ <br /> i Dispenser— ❑ ❑ ❑ Dispenser— ❑ ❑ ❑ <br /> Di <br /> enser— E] [JLlDispenser— ❑ El 1:1 <br /> 8. Leak detection is properly located within under-dispenser containment. <br /> Yes No N/A Yes No N/A <br /> Dispenser— 1/2 Multi-product ® ❑ ❑ Dispenser— ❑ 11 ❑ <br /> Dispenser— ❑ ❑ Dispenser— ❑ ❑ <br /> Dispenser— ❑ ❑ ❑ Dispenser— ❑ ❑ I ❑ <br /> Dispenser— [T ❑ ❑ Dispenser— ❑ ❑ 1 ❑ <br /> PAPERWORK INSPECTION Yes No N/A Date Done <br /> 9. Monitoring System Certification was completed within the past 12 months? ® EJ ❑ 9/27/2007 <br /> 10. Line Leak Detectors were tested/certified within the past 12 months? ® El9/27/2007 <br /> 11. Spill bucket(containment structure)testing completed within the past 12 months? ® [:JE] 9/27/2007 <br /> 12. Line tightness testingcompleted within the required time frame? ® ❑ ❑ 2/13/2007 <br /> 13. an <br /> Secondary containment tests completed within the required time frame? i4 10405 ❑ 10/5/2007 <br /> 14. Enhced Leak Detection completed within the required time frame? t <br /> 15. Other required testing/maintenance was completed within required time frame? (List lest/maintenance items below.) <br /> Describe Test/Maintenance: Drop Tube Integrity Test-every 3 yrs ®] ❑ ❑ 10/31/2005 <br /> Describe Test/Maintenance: Static Torque&Rotation Test-every 3 yrs ® ❑ ❑ 1 10/31/2005 <br /> FACILITY EMPLOYEE TRAINING Yes No N/A <br /> 16. Have all facility employees received the required on-the-job training within the past year? ® ❑ ❑ <br /> FIT Have all facility employees hired within the past 30 days received the required on-the-job training.? ® ❑ ❑ <br /> Note: Explain any"No"answers in the"Comments" section on the following page_Those issues require corrective action from <br /> the UST owner/operator. <br /> UN-057-1/2 www.unidocs.org 9/26/05 <br />