Laserfiche WebLink
sae . <br /> Aff rd -T :116 2nd Street ® Dynamic Back Pressure Test <br /> o a eft Galt,Ca.9632 Static Pressure Decay Test <br /> (209)744 0112(800)524 9087 FAX(209)744-0116 <br /> TP 201.3 201.4 <br /> Owner/Contractor/Eng: CITY OF LODI TEST DATE: 9-26-08 TIME: 815 <br /> UST 201.3 El AST 201.313 <br /> TECHNICIAN NAME: n t-1 �I <br /> SITE NAME: LODI CORP YARD LJ PT I I Startup Test ICI Compliance Test <br /> David A.Winkler SJV40082 Exp 02/27/10 <br /> Address: 1331 SHAM <br /> City: LODI CA I declare, under penalty of perjury under the laws of the state of Inspector:NONE <br /> California that based on information and belief formed after <br /> Phone: DENNIS reasonable inquiry, ents and information provided in <br /> Pregent Not Present 15� <br /> Contact: 209-333-6830 the document ar nue, accurate, nd complete. <br /> Permit or Facility#N4871 <br /> TECH SIGNATURE <br /> Confirmation#08-8412 <br /> #DISPENSERS 1 DISPENSER Make: WAYNE NOZZLE Ma e:E.W PV Valve Make:HUSKY <br /> #TOTAL NOZZLES 2 Model: Model:A4005 Model: 4885 <br /> MANIFOLDED: Yes ® No❑ BALANCE (E ASSIST ❑ Assist Type: <br /> � Tank 1 Tank 2 Tank 3 Tank 4 TOTAL <br /> Fuel Grade 87M 87S ALL Initial pressure before testing-0 " we <br /> #Nozzles per Tank 2 2 2 <br /> EQUIPMENT <br /> Actual Tank Capacity 10000 2052 12052 Decay: Blockage: <br /> Gasoline Volume 5838 815 6653 <br /> Incline Manometer ❑ Incline Manometer El <br /> Ullage(capacity minus Volume) 4162 1237 5399 Magnehelic Guage ❑ Magnehelic Guage <br /> Phase I System Type:2pt EVR Coaxial EVR <br /> Digital Manometer ® Digital Manometer <br /> Hnitial Test Pressure(locbes water)2/0 2.0 Equipment Calibrutieu-Bitter 8-1-08 <br /> 198 Drift Check End Value: 0-PASS P <br /> PSI n . <br /> 1 Minute(Inches water) . <br /> PSI @ 2 Minutes 1.96 <br /> PSI a 3 Nlinutes 1.95 <br /> h <br /> PSI @ 4 Minutes 1.94 <br /> Final Pressure C 5 Minutes(Inches water) 1.92 Time 2: <br /> Allowable Final Pressure GARB 1.72 Time 3: <br /> ------- ------- ------- ------- PASS Liquid Removal Check,Dynamic Back <br /> Pressure(if due),and Parts& <br /> Repairs Are Listed on Back <br />