Laserfiche WebLink
DYNAMIC BACK PRESSURE TEST DATA (BLOCKAGE) TECHNICIAN: save winlder <br /> Cert# Exp. <br /> Site: CORP YARD Date: 9-26-08 Time: 815 <br /> Nozz/ Fuel 20 CFH 60 CFH 100 CFH PASS/FAIL Nozz/Fuel 20 CFH 60 CFH 100 CFH PASS/FAIL <br /> 15"Water 45" Water (.95" Water) Grade (.15"Water) (.45"Water) (.95"Water) <br /> Grade (• ) ( ) <br /> 1 87 .06 .30. .60 PASS --- <br /> 2 87 .06 .33 .63 PASS <br /> LIQUID REMOVAL CHECK **See Long Form Test Report for Wet Failure Testing i Blockage Tester Integrity: <br /> ll-Dry N/A1 1.00" w.c. @ 5 minutes PAST <br /> 1 ®DRY ❑DRY <br /> []DRY []DRY ❑DRY []DRY ❑DR ❑DRQ ❑DRnil <br /> nd <br /> ml nil nil nil nil <br /> ®DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRQ ❑DRQ ❑DRnil <br /> 2 <br /> nil int nil nil <br /> ❑llRY []DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRnil n <br /> nil nil nil nil nil <br /> nil rni❑DRY ❑DRY []DRY ❑DRY ❑DRY ❑DR il ❑DRQ ❑DR--t—, mt ❑DRnd <br /> nil ml ml nil <br /> Job Complete Repairs Done to Pass Test: <br /> ❑ Not Complete Repairs Still Needed: <br /> DFill Adaptor Gaskets 1 Hoses 8FOOT Whip Hose <br /> Parts: None rop Tube rings <br /> Nozzles 1 Breakaways HUSKY PV Valves Others: <br />