Laserfiche WebLink
SEF'-10-2009 17:00 CITY OF LODI 209 333 6710 P.05 <br /> UNDERGROUi ._ STORAGE TANK MONI _ JRING PLAN <br /> For use by Unidoes Member Agencies or where approved by your Local Jurisdiction <br /> Authority Cited: Title 23 CCR, Sections 2632(d)(1), 2634(d)(2), and 2641(h) <br /> TYPE OF ACTION ❑ L NEW PIAN ® 2.CHANGE OF INFORMATION ( <br /> PLAN TYPE ® MONITORING IS IDENTICAL FOR ALL UST,,AT THIS FACILITY, X02' <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S); <br /> I. FACILITY INFORMATION <br /> PACIL17Y ID#(Agency Use Only) - - <br /> FACILITY NAME City of Lodi, Municipal Service Center Moa. <br /> FACILITY SITEADDRHSS 1331 S. Ham Lane M01 CITY Lodi, CA_ 95242 tiros <br /> H. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(c,g.,sensors,probes,line leak detectors,ctc.)be performed in M06. <br /> accordance with the equipmont manufacturers' instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. <br /> M°7 <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): <br /> 111. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> lino leak detector,monitoring system control panel,ctc.). If you already have a diagram(c.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc,)which shows all required information_include it with this plan. <br /> IV. TANK MONITORING <br /> M10 <br /> MONITORING IS PE=RFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) <br /> ® 1.CONTINUOUS ELEC]'RONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS; ® a.DRY ❑ b,LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M" <br /> M1z. <br /> PANEL MANUFACTURER; Veeder-Root MODEL 4: TLS 350 M13. <br /> LEAK SENSOR MANUFACTURER: Veeder-ROnt Ml° MODEL#(S); 420 Mss, <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TAN '5 ht1�, <br /> PANEL MANUFACTURER: M16 MODEL#: <br /> IN-TANK PROBE MANUFACTURER: M1e MODEL#(S): M19 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY M20. <br /> ❑ d,MONTIILY ❑ c.OTHER(Specify): Twat. <br /> Mz2 M23. <br /> PROGRAMMED TESTS: ❑ a,0,1 g•P•h. E] b.0.2 g.p.h. Elc.OTHER(Specify)' <br /> M2A. <br /> ❑ 3,INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646,1 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ <br /> b.60 HOURS M25. <br /> ❑ S.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> M26. IHS?. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): <br /> ❑ 6-VISUAL MONITORING DONE; ❑ a.DAILY ❑ b.WEEKLY(Kmlrc9 agency approvnt) <br /> M28. <br /> ❑ 99.O'T'HER(Specify). <br /> V. PIPE MONITORING <br /> M7°, <br /> MONITORING IS PERFORMED USING THE FOLLOWING METIIOD(S)(Check all that apply) <br /> ISI 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)iTRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b,LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM rk31. <br /> Veeder_R "' MODEL#: TLS 350 <br /> p,gNF:L MANUFACTURER; OOt __ <br /> M35. <br /> LEAK SENSOR MANUFACTURER: Veeder-ROOt _ _ M34 MODEL 4(S): <br /> 208 <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i,c., TURBINE)SHUTDOWN? ® a,YES ❑ b.NO M36. <br /> WILL FAILURIIDISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? M a,YES ❑ b.NO M37. <br /> ® 2.MECHANICAL I.INE LEAK DETECTOR (MLLD) THAT ROUTINFI.Y PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> MILD MANUFACTURER(,,);F F a orless Manuf.. InC. NMI) M's' MODEL#(S): STP-MLD-D; 99 000 LD2M'9 <br /> ...-P�IC4. <br /> ❑ 3.ELECTRONIC LINK LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> M41. <br /> ELLD MANUFACTURER: M40. MODEL#: <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ u.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL,0,1 g.p.h. M4z. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO Ma,, <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M44 <br /> ❑ 4.INTEGRITY TESTING <br /> M45. M46 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS [] c.OTHER(Specify) <br /> ❑ S.VISUAL MONITORING DUNE: ❑ a,DAILY .R�Iro arteacyE ppronl .aWowc pr anon orriing c Oc9ux�Y�6�y 8 naMa N p pEe 004'P�ES�4 szsi.s(b)(s) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXL•MPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> M49, <br /> ❑ 99.OTHER(Specify) <br /> UN-022A-115 www.unidota.org Rev.10/14/03 <br />