My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO 2006 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2019 4:07:20 PM
Creation date
12/5/2018 9:18:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2010
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/21/2006 12:07 8007001188 WESTERN FIBERGLASS PAGE 07 <br /> CONTACT US FOR MORE INFORMATION! <br /> 1555 Copperhiil Parkway/Sonia Rosa,CA <br /> Ph: (800) 688-3375 or (707) 523-2050 <br /> www.westernfg.com <br /> TEST PROCEDURES FOR SINGLE WALL: <br /> After the sump to tank fitting is completed, you shall test the integrity of your <br /> seal. This is important to insure that the sump riser tube / tank bond will not <br /> allow any contained fluid to leak. Check with local regulations for required <br /> testing procedures. A common test procedure is to fill the sump with water <br /> after the sump / tank bond has completely cured, usually overnight, and <br /> observe bond seam for any leaks. <br /> PLEASE NOTE: U.L. listed sumps require a listed, approved, electronic <br /> monitor/alarm system to be installed for operator notification in the event of <br /> product leakage within sump area. <br /> TEST PROCEDURES FOR DOUBLE WALL. <br /> After completion of the sump body test as described above, you may test <br /> the sump body interstitial space by applying no more than 2 psi to the port(s) <br /> installed within the sump body. The annular space may also be tested using <br /> liquid or vacuum. For test times or other requirements, always follow local <br /> regulations and restrictions. <br /> PLEASE NOTE: UA. listed sumps require a listed, approved, electronic <br /> monitor/alarm system to be installed for operator notification in the event of <br /> product leakage within sump area. <br /> COPYRIGHT 2006 BY WESTERN FIBERGLASS, INC. <br /> ALL RIGHTS RESERVED.USE BY WRITTEN PERMISSION ONLY. Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.