My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO 2006 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2019 4:07:20 PM
Creation date
12/5/2018 9:18:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2010
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/21/2006 12:07 8007001188 WESTERN FIBERGLASS PAGE 03 <br /> CONTACT US FOR MORE INFORMATIONI <br /> 1555 Copperhill Parkway/Santa Rosa, CA <br /> Ph. (800) 688-3375 or (707) 523-205D <br /> www.westernfg.com <br /> Tank Sump <br /> INSTALLATION INSTRUCTIONS <br /> Please read all instructions completely rior to installation. These instructions <br /> do not supersede local laws and regulations. Always comply with local <br /> requirements. <br /> PRE-BONDING SURFACE PREPARATION: <br /> BE SURE TO WEAR A DUST MASK! After positioning sumps onto tank collar or <br /> after placing reducer on sump riser tube, use disc sander, with medium to <br /> heavy grit sand paper, to scuff up all seam areas a minimum of 4" each side <br /> of the point where the components join. It is very important that this be done <br /> fully, as the bonding materials will not adhere to any surface that has not <br /> been sanded. Brush sanding dust from seam areas. <br /> SEAM LAMINATIONS: <br /> CAUTION: Always wear gloves when handling fiberglass bonding materials! <br /> Use one plastic bucket with acetone to clean roller, brushes and squeegee. <br /> Return tools to this bucket between use to prevent bonding materials from <br /> drying on them. BE SURE TO SHAKE THE ACETONE OUT OF TOOLS BEFORE RE- <br /> USE! <br /> Lay out fiberglass materials at each seam to be bonded. (2 x 1.5oz FRP matt <br /> for collar attachment. 2 x 1.5oz and 1 x I Soz woven roving material for direct <br /> attachment.) <br /> SAND/BOND AREA <br /> swr R <br /> SAND/BOND AREA <br /> TANK OOLI rR--- _.__•--^--� <br /> TAMC <br /> COPYRIGHT 2006 BY WESTERN FIBERGLASS. INC. <br /> ALL RIGHTS RESERVED. USE BY WRITTEN PERMISSION ONLY. Page I Of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.