Laserfiche WebLink
Sep 05 06 04: 24p JP PP+roleum Service 916372d073 p, 3 <br /> SB Series Pelletbane Split Repair Boots Installation Instructions <br /> For Encalnulation Repairs) <br /> STEP 1 Identify the damaged boot and seleet the proper Blueline Repair <br /> Boot based upon the number of studs and the pipe OD.(See 2006 <br /> Catalog,Section 10 and Appendix l) 7 AMP <br /> .i <br /> STEP 2 Install all Pellethane split components onto the pipe carefully.All — <br /> Pellethane pieces must be rebonded back together with Blue Seal <br /> Glue.This is done by ensuring that the surfaces are clean and dry. <br /> Apply a liberal bead of Blue Seal and hold the scam closed ill <br /> securely until it is fused. It's helpful to use the clamps to loosely i <br /> hold the boot closed during curing. Bonded connections should <br /> hold themselves closed within rive minutes if there are no stresses ^`j <br /> on them.The Blue Seal glue will be fully cured in 40 minutes. �. <br /> i. <br /> STEP 3 Once all Blueline approved components are bonded, apply a <br /> liberal bead of either Parasealant 626, or Bostik 110017S to the : <br /> underside of the seal.This will make the seal with the sump wall. l <br /> 1;Insert poly ring into the gasket and position the ring around the <br /> old fitting and against the sump wall. '\\' <br /> X <br /> STEP 4 Install the self tapping tek screws through the holes in the poly <br /> ring and tighten until snug.(Be careful not to over tighten as the <br /> holes can be easily stripped out.) , <br /> STEP 5 Apply a bead of Blue Seal Glue along the gasket rim and install <br /> the boot onto the seal. Install boot with rill tube at the 12.00 {:t^ <br /> position.Install band clamp to secure the boot to the gasket. <br /> CLUELINE <br /> TECHNOLOGIES LLC 265 Burns Drive. • :4: <br /> . .g <br />