My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO 2006 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2019 4:07:20 PM
Creation date
12/5/2018 9:18:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2010
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sep 05 06 O4: 24p JP Pp*.roleum Service 9163724173 p. 4 <br /> Split Repair Boots Intallatiou Instructions <br /> j For Encapsulation Repairs) <br /> STEP 6 Position the insert into the boot if applicable,but do not tighten <br /> the clamp.This connection must remain loose through the filling <br /> t <br /> stage to allow air to escape. <br /> STEP 7 Fill the boot with either Parasealant 626, or Bostik 1100FS <br /> through the fill tube with the Blueline pneumatic dispensing gun <br /> until the entire cavity is full. This will ensure that the sealant <br /> pushes back through the leak point and stops the leak. <br /> All- <br /> STEP Once the boot is full, tighten clamps and allow sealant to fully <br /> cure. The sealant will gradually continue to cure up inside the <br /> boot and around the flange over the next 24-48 hours.However, <br /> you may start hydrostatic testing immediately as the repair is <br /> complete.BLUELINE r <br /> ■ ■ Drive, ■ :4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.