My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO 2006 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2019 4:07:20 PM
Creation date
12/5/2018 9:18:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2010
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to the untested secondary components. Mr. Shih determined that a permit would not be <br /> required for the repairs. <br /> On July 30,2003,the EHD received a copy of the test results (Attachment 7)performed on <br /> July 21,2003, for piping and sump#3 (diesel). Both secondary components that were tested <br /> passed. <br /> On October 10, 2003,the EHD received a copy of test results(Attachment 8)performed on <br /> October 2,2003 for sumps tested. There was no designation as to which tanks the sumps <br /> belonged. <br /> On March 22,2004,Ms. Dina Abate performed a routine inspection and witnessed a <br /> monitoring certification. It was noted in the inspection report(Attachment 9)that the used <br /> oil sump and piping had not undergone secondary containment testing. Certification of <br /> financial responsibility was also requested for the second consecutive year. Also noted in <br /> the report was a failure of the diesel spill bucket for tightness. <br /> On May 20, 2004,the EHD received the results of the secondary containment testing for the <br /> waste oil system(Attachment 10). The tank, sump, and piping were tested and passed. The <br /> submittal also included other requested documents such as the certification of financial <br /> responsibility and letter from the chief financial officer(dated April 13, 2003),monitoring <br /> and response plan,and maintenance records. <br /> On August 10,2004,Mr. Dennis Catanyag sent a follow-up letter to the City of Lodi <br /> (Attachment 11)requesting a copy of the certification of financial responsibility and letter <br /> from the Chief Financial Officer for the diesel system. Also noted in the letter was the <br /> failed diesel spill bucket. The EHD had not received any update on its status. <br /> On August 13, 2004,Mr. Catanyag received a call from a very upset Mr. Roger Rich,Fleet <br /> Supervisor for the City of Lodi. Mr. Rich could not understand why the letter was sent <br /> because he had submitted the same documents to the EHD four times. Mr. Catanyag <br /> explained to Mr. Rich that the certification of financial responsibility and letter from the <br /> chief financial officer that was submitted was dated April 14,2003. The coverage period <br /> would have ended April 14, 2004. It was also explained to Mr. Rich that the EHD had not <br /> received any information on the status of the diesel spill bucket. <br /> As of August 31,2004,the facility remained out of compliance and still operated,without <br /> an operating permit. Secondary containment testing was completed upon receiving the last <br /> test results on May 20,2004, for the waste oil tank. However,the EHD has not received the <br /> certification of financial responsibility and letter from the Chief Financial Officer for 2004. <br /> A failed diesel spill bucket has not been addressed by the facility. <br /> On October 15,2004,Mr. John Jackson conducted a routine inspection. On this date,the <br /> certification of financial responsibility with a signed date of April 20,2004,was given to <br /> Mr. Jackson. Mr.Jackson noted in the inspection report(Attachment 12)and also notified <br /> Dennis Callahan that cathodic protection must be performed and the facility/tank <br />
The URL can be used to link to this page
Your browser does not support the video tag.