Laserfiche WebLink
S W RCD. Jauivary 2002 Page of <br /> 8. FILL RISER CONTAINMENT SUMP TESTING <br /> Facility is Not Equipped With Fill Riser Containment Sumps _ <br /> Fill Riser Containment Sumps are Present, but were Not Testcd (1, <br /> Test Method Developed By: l.1 Sump Manufacturer .' Industry Standard Professional Engineer <br /> 7 Other(Speci / <br /> Test Method Used: I Pressure j Vacuum Hydrostatic <br /> ❑Other(Specih) <br /> Test Equipment Usi d; Equipment Resolution:' <br /> Fill Sum # Fill Sump # Fill Sum #.,l Fill Sum # <br /> Sump Diameter: j <br /> Sump Depth: <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: j <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to ' <br /> testing: <br /> Portion of Sump Tested <br /> Sump Material: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Rj):/l_ <br /> Pass/Fail Threshold or C d eria: <br /> Test Result: ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Is there a sensor in a sump? 11 Yes ❑No ❑Yes ❑No ❑ Yes ❑ No ~ ❑ Yes ❑No <br /> Does the sensor m arwhen <br /> either prod uc r water is ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Y�E] o ❑NA <br /> detected? <br /> Was sen§&removed for testing? ❑ Yes ❑No ❑ NA ❑Yes ❑No ❑NA ❑Yes 11 No 11 NA 11 Yes 11 N6,1, NA <br /> Was sensor properly replaced and <br /> verified functional after testin ? (--1Yes r]No 1i NA ❑Yes ❑No ❑NA C Yes ❑No ❑NA fJ Yes i_;No ENA <br /> Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />