Laserfiche WebLink
SWRCB, January 2002 Page �_l of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes !I <br /> Spill/Overfill Containment Boxes are Present, but were Not rested <br /> Test Method Developed By: Spill Bucket Manufacturer ;Industry Standard Professional Engineer / <br /> Other(,Spero,) <br /> 'rest Method Used: Pressure G Vacuum Ll Hydrostatic,-' <br /> Other(.SpecVy) /` <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box#._ Spill Box # Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: i <br /> Test Start Time: <br /> a <br /> Initial Reading(Rj): <br /> Test End Time: <br /> 44 <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(Rr-Rj): <br /> Pass/Fail Threshold or <br /> Criteria <br /> Test Result: ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments—("include information on repairs made prior to testing, and recppommended follow-u for ailed test , <br /> A_e� <br />