Laserfiche WebLink
San Joaquin County <br /> .� Environmental Health Department DIRECTOR <br /> .o <br /> �•.• ��� .G Donna Heran,REHS <br /> Q: z� 1868 East Hazelton Avenue <br /> W' :{ Stockton, California 95205-6232 PROGRAM COORDINATORS <br /> III Robert McClellon,REHS <br /> Jeff Carruesco, REHS, RDI <br /> Kasey Foley,REHS <br /> y /FO.R�� Website: www.sjgov.org/ehd Linda Turkatte, REHS <br /> Phone: (209)468-3420 Rodney Estrada,REHS <br /> Fax: (209)464-0138 Adrienne Ellsaesser, REHS <br /> November 27, 2013 <br /> Joseph Bagley 4 ' <br /> 2370 Maggio Circle #4 1 L Ew <br /> Lodi, CA 95240 <br /> Re: Lodi Muni Service Center 1331 S. Ham Ln. Lodi, CA 95242 SR0068175 <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of <br /> the application for a permit to remove and replace the 87 overfill alarm and remove and replace <br /> the 87 T2 fill bucket drain valve on the underground storage tank (UST) system at the above <br /> noted address. The permit has been approved with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Aris Cacapit at (209) 468-3453 to arrange the following inspection appointments <br /> (a 48-hour notice is required for inspection appointments). Please be aware that <br /> inspections for emergency work must be scheduled within five days of permit approval. <br /> a. Sensor functionality: Functionality of the monitoring system must be verified to <br /> ensure that monitoring has been restored to meet the requirements of Title 23 <br /> California Code of Regulations and the Health & Safety Code. If it is determined that <br /> a cold start is necessary, a copy of the alarm history shall be printed prior to <br /> performing the "cold start" of the Veeder Root system and made available at the time <br /> of EHD inspection. <br /> b. Overfill prevention verification: Verify that external audio and visual alarm activates <br /> when tank is 90% full. <br /> c. Spill bucket test: Verify minimum 5-gallon capacity and pass a one hour hydrostatic <br /> test (or equivalent). Proper drainage must also be verified. <br /> Please be aware that the facility cannot receive fuel in the 87 T2 tank prior to the <br /> EHD inspection and approval. <br /> 4. Qualified service technicians must possess or work under the direct and personal <br /> supervision of an individual physically present at the work site who possesses all of the <br /> following: <br /> a. One of several permissible valid, current contractor's licenses issued by the <br /> Contractors State License Board (may be issued to the installation company), or a <br /> Tank Tester's license issued to the individual by the State Water Board, and <br />